Quotation are invited for MFO-1B & MFO-1C Tank FF Cooling Spray Line Replacement Work-D Station. D STATION # MFO#1B & MFO#1CFF SPRAY COOLING LINE REMOVAL AND REPLACEMENT WORK**LINE DETAILS·#LINE SIZE: 2½ INCH - APPROX - 30 TO 36 M LENTGTH·#TOTAL SPOOLS: APPROXIMATELY 5 SPOOLS (AS PER SITE CONDITION)·#FLANGES: AROUND 08#12 NUMBERS·#FABRICATION: TO MATCH THE EX ISTING PIPELINE LAYOUT, INCLUDING BENDS,SUPPORTS, NOZZLES, FLANGES, COUPLERS, AND ANY OTHER REQUIRED FITTINGS·#MATERIAL SUPPLY: ALL MATERIALS AND PAINT WILL BE SUPPLIED BY DEWASCOPE OF WORK1. GENERAL DESCRIPTIONTHIS SCOPE COVERS THE REMOVAL OF THE EXISTING FIRE FI GHTING (FF) SPRAYCOOLING LINE FOR MFO#1B AND MFO#1C AND THE INSTALLATION OF A NEW LINE ASPER EXISTING SITE CONDITIONS, AND SAFETY RE QUIREMENTS.2. REMOVAL / DISMANTLING WORKS·#ISOLATE THE FIRE WATER SUPPLY AND ENSURE THE LINE IS FULLYDEPRESSURIZED.·#BARRICADE THE W ORK AREA AND IMPLEMENT ALL REQUIRED SAFETYPRECAUTIONS.·#REMOVE THE EXISTING FF PIPELINE, FITTINGS, SUPPORTS, VALVES, ANDASSOCIATED C OMPONENTS.·#CUT AND DISMANTLE CORRODED OR DAMAGED SECTIONS AS REQUIRED. (COLDWORK ONLY)·#SEGREGATE REUSABLE ITEMS (IF ANY) AND DISPO SE OF SCRAP MATERIALS ASPER SITE WASTE#MANAGEMENT PROCEDURES.·#CLEAN THE WORK AREA AFTER DISMANTLING.3. INSTALLATION OF NEW FF LINE· #FABRICATE AND INSTALL NEW 2½#INCH PIPE SPOOLS AS PER EXISTING ROUTINGAND SITE MEASUREMENTS.·#INSTALL BENDS, REDUCERS, TEES, NOZZLES , FLANGES, COUPLERS, ANDSUPPORTS AS REQUIRED.·#ENSURE PROPER ALIGNMENT, LEVELING, AND SLOPE AS PER DESIGN AND SITECONDITIONS.·#CARRY OUT WELDING, GRINDING, AND JOINT PREPARATION AS PER QA/QCREQUIREMENTS.·#PERFORM EXTERNAL SURFACE PREPARATION AND APPLY PRIMER/PAINT AS PERSPECIFICATION.·#INSTALL ALL FF SPRAY COOLING LINE COMPONENTS AS PER THE ORIGINAL CONFIGURATION. 4. TESTING AND COMMISSIONING·#CONDUCT HYDROSTATIC PRESSURE TESTING OF THE NEWLY INSTALLED LINE.·#RECTIFY ANY LEAKS OR DEFECTS IDENTIFIED DURING TESTING.·#FLUSH AND CLEAN THE PIPELINE PRIOR TO COMMISSIONING.·#COORDINATE WITH DEWA/CLIENT/CONSULTANT FOR INSPECTION AND FINALAPPROVAL.5. DOCUMENTATION·#SUBMIT WELDING REPORTS, NDT REPORTS, AND TEST CERTIFICATES.·#PROVIDE PHOTOGRAPHIC DOCUMENTATION BEFORE, DURING, AND AFTER THEWORK.·#SUBMIT AS#BUILT DETAILS FOR THE REPLACED SECTIONS.6. SAFETY REQUIREMENTS·#FOLLOW ALL DEWA SITE SAFETY RULES AND PERMIT#TO#WORK PR OCEDURES.·#USE CERTIFIED SCAFFOLDING, LIFTING TOOLS, AND PPE.·#ENSURE FIRE WATCH AND HOT#WORK PERMITS DURING CUTTING AND WELDINGACTI VITIES.CONTACT PERSON- ASHOKGIRI- 0529174058 /
[email protected] Qty: 1 STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332600699)/$value