E Left Lower Rhine Drainage Cooperative (Lineg) Intends To Upgrade The Mechanical, Structural And Electrical Engineering Of The Intermediate Pumping Station At The Rheinhausen Sewage Treatment Plant (Ka). The Subject Of This Tender Is The Structural Engineering (Bt) Work To Equip The Intermediate Pumping Station With New Wastewater Pumps, Pipes And Fittings. The Tender Includes The Following Services: - Demolition And Sawing Work On The Basement Ceiling In The Workshop - Over-Drilling Of Existing Wall Pipes And Subsequent Grouting - Demolition And Sawing Work On The Existing Pump Base - Restoration Of New Pump Bases - Diversion Of Internal Service Water - Scaffolding Work - Producing Support And Stiffening Frames Using Steel Structures - Concrete Work In The Intermediate Shaft - Producing Covers
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.