Construction Work – Hendschiken Io/Ao; K123 With Cycle Path R541 And New Building Lsa Ag 677. Paving Demolition/Surface Milling Material 5,570 M3 Removal Of Top/Subsoil 10,340 M3 Route Excavation 10,840 M3 Excavation Of Structures 785 M3 Trench Excavation Wl 6,255 M3 Edge Finishes 2,735 M Paving 380 M2 Addition Of Foundation Layer 1,030 M3 Leveling Area 26270 M2 Installation Of Base Layer 4,565 T Installation Of Top Layer 1,125 T Installation Of Mastic Asphalt 30 T Creation Of Top/Subsoil 9,090 M2 Creation Of Marl Shoulders 3,770 M2 Creation Of Saba System: Pre-Shaft L=3.10M W=2.10M D=2.50 Basin L= 12.00M B=3.60M T=3.12M-3.72M Pump Shaft L= 2.10M B=2.10M T=3.15M Shaft With Emergency Protection L=1.50M B=1.50M T=2.10M Retention Filter Basin For Saba: Inlet Structure L=2.01M B=2.30M T=2.99M Outlet Structure L=3.30M B=1.80M D=3.26M Pool Circumference=95.00M T=2.70M-3.26M Construction Of Stone Basket Walls Including Foundation Hmax=4.10M L=220M Construction Of Block Stone Walls Including Foundation Hmax=1.85M L= 50M Control Shafts Drainage And Wastewater Pipes 22 Pcs. Inlets (Üsa / Sa / Schlücke / Sf) Drainage And Wastewater Pipes 67 Pcs. Drainage And Wastewater Pipes 1,810 M Empty Pipes, Media Pipes 4,680 M Inspection Shafts, Media Pipes 48 Pieces. Water Pipes Fzm 1,175 M; Pe 430 M Hydrants 2 Pcs. Line Valves 24 Pcs. Empty Pipes For Electricity/Electricity 4650 M Empty Pipes For Lighting 1,000 M New Construction Of Candelabra 33 Pcs. Empty Pipes For Communication 185 M Empty Pipes For Tv 110 M Control Shafts For Communication 2 Pcs.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.