In The Contract, The Compact Surface Structures And Top Soil Layer Of The Approximately 4,000 M2 Hazardous Waste Landfill Cell T1 Will Be Built In The Ämmässuo Ekoteollisuuskeskus. The Contract Will Be Implemented In Two Phases. In The First Phase, The Compact Structures Of The Landfill And The Approximately 0.5 M Thick Lower Topsoil Layer Will Be Built, And The Ventilation Structures Of The Canopy Will Be Dismantled. After This, The Weather Protection Canopy Is Dismantled, After Which The Upper Topsoil Layer Is Built In The Second Stage. A Dry Meadow Of A Parched Place Is Sown On Top.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.