Solar Photovoltaic Modules – Construction Of Photovoltaic Installations On Municipal Properties In Racibórz. 1. The Subject Of The Order Includes The Construction Of Photovoltaic Installations On Municipal Properties In Racibórz In The Design And Build Formula, Including In Particular: 1) Preparation Of Complete Design Documentation Along With All Legally Required Arrangements, 2) Delivery And Assembly Of Photovoltaic Installations With Energy Storage Facilities, 3) Implementation Of An Electricity Monitoring And Management System, 4) Conducting Instructions In The Operation/Management Of Installations At The Following Locations/Facilities: A) Kindergarten No. 11 In Racibórz Ul. Jana 20, 47-400 Racibórz; B) Kindergarten No. 14 In Racibórz Ul. Słoneczna 31, 47-400 Racibórz; C) Kindergarten No. 24 In Racibórz, Ul. Bielska 2, 47-400 Racibórz; D) Primary School No. 1 In Racibórz Ul. Cecylii 30, 47-400 Racibórz; E) Primary School No. 15 In Racibórz, Ul. Juliusza Słowackiego 48, 47-400 Racibórz; F) School And Kindergarten Complex No. 2 In Racibórz, Ul. Juliana Tuwima 1, 47-400 Racibórz; G) School And Kindergarten Complex No. 3 In Racibórz, Ul. Sudecka 2, 47-400 Racibórz; H) Osir Entertainment And Sports Hall In Racibórz, Ul. Łąkowa 31, 47-400 Racibórz; I) H2ostróg Swimming Pool In Racibórz, Ul. Zamkowa 4, 47-400 Racibórz; J) Photovoltaic Farm, Plot No. 81/30, Unit Register 241101_1, Precinct 0001 Brzezie, Racibórz Commune. Attention! 1) The Works Will Be Performed In Active Facilities/Units, Therefore The Contractor Is Obliged To Plan And Carry Out The Works In A Way That Guarantees Continuous Operation Of The Facilities/Units And Minimizes Restrictions And Inconvenience Related To The Work Performed. 2) The Ordering Party Notes That The Functional And Utility Program For Educational Buildings (Document Pfu - Racibórz Education Buildings.Pdf) Includes Primary School No. 13 In Racibórz And Kindergarten No. 23 In Racibórz, Which Are Not Covered By The Subject Of The Order. 2. A Detailed Description Of The Subject Of The Order Is Included In The Functional And Utility Program, Dnsh Guidelines, Constituting Annex No. 5 To The Swz. 3. Other Requirements Are Specified In The Contract Template Constituting Annex No. 4 To The Swz. 4. The Contractor Provides The Ordering Party With A Minimum 60-Month Warranty For The Completed Subject Of The Contract, Counting From The Date Of Signing The Final Acceptance Report Of The Works, Provided That The Devices Included In The Installation Must Have The Following Manufacturers Warranties: 1) For Photovoltaic Modules: A) Against Hidden Defects - Min. 10 Years From The Date Of Signing The Final Acceptance Protocol Of The Investment Task By The Ordering Party, Which Is Confirmed By The Manufacturers Warranty; B) For Power Yield From Photovoltaic Modules – Min. 85% After 30 Years Of Installation Operation, Which Is Confirmed By The Manufacturers Warranty. 2) For Inverters/Inverters - For A Period In Accordance With The Declaration Included In The Offer Form, But Not Less Than 10 Years From The Date Of Signing The Final Acceptance Protocol Of The Investment Task By The Ordering Party, Which Is Confirmed By The Manufacturers Warranty; 3) For Energy Storage Facilities – For The Period Specified In The Declaration Included In The Form
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.