Plasterboard Works – Drywall Work 4Th Ba - Conversion And Expansion Of The Rainbow School With Cafeteria In Seelze. The City Of Seelze Intends To Subject The North Wing Of The Rainbow School To Comprehensive Modernization, Renovation And Structural Optimization. This Step Represents The Fourth Construction Phase Of The Overall Project, After The Extension Of A Cafeteria Was Realized, An Interim Building Was Built For The Temporary Accommodation Of The Affected Classes And The South Wing Was Renovated. The Services To Be Provided As Part Of The Tender For Drywall Construction Work In The 4Th Construction Phase (Ba) Essentially Include The Construction Of Interior Walls And Pipe Cladding In Standard And Wet Room Versions. In Addition, The Production Of Various Ceiling Structures Is Planned, Consisting Of Mineral Fiber Grid Ceilings, Plasterboard Ceilings And Wood Wool Acoustic Ceilings. The Scope Of Services Also Includes The Execution Of Interior Insulation Work Using Mineral Foam Panels In The Area Of The Wall-Ceiling Connections On The 2Nd Floor. Integrating Interior Walls Must Be Provided With Professionally Executed Flank Insulation On Both Sides. In Addition, Column Heads In The Area Of The Grid Facade Must Be Insulated All Around. The Side Surfaces Of The Supports Must Be Provided With Reveal Insulation Including Professional Connection To The Window Frames. Please Refer To The Tender Documents For All Further Information.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.