Cycle Path Construction Work – Construction Of A Metropolitan Bicycle Road (Velostrada No. 7) Connection Sosnowiec - Czeladź, In The Czeladź Commune. 1. Subject Of The Order 1.1. The Subject Of The Order Is The Design And Construction Of A Bicycle Path In The Czeladź Commune. As Part Of The Implementation Of The Subject Of The Order, The Contractor Will Be Obliged To: - Prepare Design Documentation And Obtain All Necessary Permits, Arrangements, Opinions, Conditions, Documents, Studies, Maps, Expert Opinions Required By Law And Necessary For The Proper Preparation Of Design Documentation, - Obtain A Decision On A Construction And Demolition Permit, Obtain A Zrid Decision, Obtain No Objection To The Construction Notification - Depending On Which Of Them Will Be Required By Applicable Law, - Exercise Authors Supervision Throughout The Duration Of The Construction Works, - Construction Of A Bicycle Path Covered By The Subject Of The Order, - Obtaining An Occupancy Permit And/Or Accepting Notice Of Completion Of Works, If Necessary. The Design Scope And Scope Of Construction Works As Part Of The Investment Called Construction Of A Metropolitan Bicycle Road (Velostrada No. 7) Connection Sosnowiec - Czeladź, In The Czeladź Commune Includes Primarily: - Construction Of Bicycle Paths On Sections With A Total Length Of Approx. 4.72 Km, Including: Velostrada - Approx. 4.37 Km, Other Routes - Approx. 0.35 Km, - Construction Of Pedestrian Roads (Along Bicycle Paths) On Sections With A Total Length Approx. 1.63 Km, - Construction Of 2 Cyclist Service Areas With Equipment And 2 Hardenings For The Planned Gzm Bicycle Rentals, - Expansion Of The District Road - Ul. Grodziecka Over A Length Of Approx. 0.10 Km, - Construction Of A Road For Pedestrians And Bicycles Over A Length Of Approx. 0.07 Km, - Expansion Of The Municipal Road - Ul. Staropogońska Over A Length Of Approx. 0.02 Km, - Demolition Of The Existing Former Railway Viaduct And Construction Of A Bicycle Footbridge Over The District Road No. 4708S (Grodziecka Street) In Czeladź, - Renovation (Adaptation) Of The Existing Former Railway Viaduct Over The National Road No. Dk 94 And The Tram Line, - Construction Of An Underpass To Provide A Pedestrian And Bicycle Path At Km 1+569, - Construction Of Vertical And Horizontal Markings And Road Safety Devices, - Reconstruction Of Traffic Lights At The Intersection Of Ul. Grodziecka, Juliana Tuwima And The Access Road On Plot No. 91, - Clearing Of Greenery Colliding With The Investment And Construction Of Replacement Plantings, - Construction Of A Storm Sewage System With Storm Inlets, - Construction Of A Viaduct Drainage System, - Construction Of A Sanitary Sewage System With Sewage Connections In The Area Of Ul. Grodziecka In The Scope Of Reconstruction Of The Road Section, - Construction Of Sections Of The Water Supply Network And Ensuring The Switching Of Fire Hydrants, House Connections And Branches, Where The Existing Water Supply Network Collides With The Planned Bicycle Path, - Construction Of Sections Of The Low-Pressure Gas Network, Where The Existing Gas Network Collides With The Planned Bicycle Path, - Regulation Of Elements Of The Water Supply, Sewage And Gas Networks (Manholes, Valve Boxes, Underground Hydrants Etc. – In Ra