Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
24-03-2026
Work Detail
Quotation are invited for Diverter Damper Bearing and Gear Box Replacement 1032601191 -Whrb 12 Diverter Damper Gear 1 ITEM-00001 G-WHRB 12 DIVERTER DAMPER BEARING REPLACEMENT1.#THE CONTRACTOR SHALL CARRY OUT BEARING REPLACEMENT WORKS FOR GSTATION#WHRB 12 DIVERT ER DAMPER SYSTEM, INCLUDING ALL LABOR, TOOLS,SUPERVISION, AND CONSUMABLES REQUIRED TO COMPLETE THE SERVICE. BEARINGSWILL BE PROVIDED BY DEWA.2.#THE SCOPE OF WORK SHALL INCLUDE REPLACEMENT OF DIVERTER DAMPER FLAPSHAFT BEARINGS, DRIVE SHAFT BEARINGS, AND TOGGLE ARM BEARINGS, INCLUDINGDISMANTLING, REMOVAL OF EXISTING BEARINGS, INSTALLATION OF NEW BEARINGS,PROPER ALIGNMENT, AND LUBRICATION AS PER OEM RECOMMENDATIONS, WITH ALLACTIVITIES CARRIED OUT IN PARALLEL TO MINIMIZE EXECUTION TIME.3.#THE CONTRACTOR SHALL CARRY OUT COMPLET E REASSEMBLY OF THE DIVERTERDAMPER ASSEMBLY AFTER REPLACEMENT OF ALL SPECIFIED BEARINGS.4.#THE CONTRACTOR MUST 1 JOB BE PRESENT DURING FUN CTIONAL TESTING OF THEDIVERTER DAMPER BEFORE COMMENCEMENT OF THE SERVICE AND AFTER COMPLETIONOF THE SERVICE.5.#THE CONTRACTOR SHALL CARRY OUT FUNCTIONAL TESTING OF THE DIVERTERDAMPER WITH DEWA AFTER COMPLETION OF WORK TO CONFIRM SMOOTH OPERATION,CORRECT TRAVEL, AN D PROPER ALIGNMENT.6.#SCAFFOLDING, FORKLIFT, MOBILE CRANE, AND CRANE REQUIRED FOREXECUTION OF THE WORK SHALL BE ARRANGED AND PROVIDE D BY DEWA. CONTRACTORHAS TO INFORM ONE WEEK IN ADVANCE FOR THESE REQUIREMENT TO DEWA INWRITING.7.#THE CONTRACTOR SHALL EXECUTE AND C OMPLETE THE ENTIRE SCOPE OF WORKWITHIN A MAXIMUM DURATION OF SIX (6) DAYS FROM COMMENCEMENT OF WORK ATSITE.8.#SITE INSPECTION IS MAN DATORY PRIOR TO SUBMISSION OF QUOTATION, ANDTHE CONTRACTOR SHALL BE DEEMED TO HAVE FULLY FAMILIARIZED THEMSELVESWITH SITE CONDITIONS , ACCESS LIMITATIONS, AND SCOPE REQUIREMENTS BEFOREQUOTING FOR THIS WORK.9.#THE CONTRACTOR SHALL SUBMIT METHOD STATEMENT AND RISK AS SESSMENT,AND PREVIOUS EXPERIENCE POS IN DEWA GENERATION DVISION DURING THE RFXSTAGE FOR DEWA REVIEW AND APPROVAL PRIOR TO AWARD OF T HE WORK.10.#NO CLAIMS FOR ADDITIONAL COST, TIME EXTENSION, OR SCOPE VARIATIONSHALL BE ENTERTAINED DUE TO LACK OF SITE INSPECTION, MI SUNDERSTANDING OFSCOPE, OR UNDERESTIMATION OF WORK.11.#THE CONTRACTOR SHALL PROVIDE A MINIMUM WARRANTY OF TWELVE (12)MONTHS FROM THE DATE OF DEWA ACCEPTANCE FOR WORKMANSHIP, INSTALLATION,ALIGNMENT, AND EXECUTION OF THE WORK G STATION G-WHRB 12 Diverter Damper BEARING and GEAR BOX REPLACEMENT STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332600684)/$value
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.