The Subject Of The Order Is The Preparation Of A Concept And, Based On It, A Design For The Development Of Recreational Areas Entitled: Góra Powąwa On Plot No. 476 And 466 (Road), District 0008 In The Town Of Kąty Węgierskie, Nieporęt Commune, Legionowo Poviat, Masovian Voivodeship, With An Area Of Approximately 2 Ha. As Part Of The Task In Question, It Is Envisaged To Design, Among Others: 1) Routes Pedestrians With A Permeable Surface, 2) Parking Lot Intended For Cars And Bicycles Of People Using The Completed Investment With A Permeable Surface, 3) Access Road (Preparation Of Design Documentation Together With Obtaining A Permit For The Implementation Of A Road Investment (Zrid) 4) Playground With A Fence, 5) Fitness Equipment (Streetworkout), 6) Zip Line, Slides, Ropes Course, 7) Water Curtain, 8) Exit For Sleigh, 9) Educational Path, 10) Elements Of Small Architecture: Single Waste Bins, Segregated Waste Bins, Park Benches, Park Deckchairs, Picnic Tables, Information Boards, Bicycle Racks, 11) Garden House For Workshops And Teaching Classes With A Storage And Sanitary Room (Office), 12) Ice Cream/Waffle Shop (Cash Register), 13) Stage With Seats For The Audience, 14) Green Area Development Project, Planting Plants, Laying A Lawn, Irrigation Installation, 15) Fencing The Area, 16) Electrical Network - Area Lighting And Gazebos, 17) Video Monitoring Of The Park, 3. As Part Of The Design Work, The Contractor Will Be Obliged To: 1) Prepare And Update A Map For Design Purposes At A Scale Of 1:500; 2) An Excerpt From The Local Spatial Development Plan; 3) Inventory Of Greenery; 4) Consent/Permit For Cutting Down Trees (Necessary For The Implementation Of The Project); 5) Exclusion From Forest Production (If Necessary); 6) Preparation Of A Concept For The Ordering Partys Opinion; 7) Preparation Of A Construction Design Including: Development Design Plot Or Area, Architectural And Construction Design, Technical Design In Accordance With The Regulation Of The Minister Of Development Of September 11, 2020 On The Detailed Scope And Form Of The Construction Design In 4 Copies - In Accordance With The Assumptions Of The Concept Approved By The Ordering Party;8) Preparation Of The Technical Specification For The Execution And Acceptance Of Construction Works - 2 Copies;9) Preparation Of The Bill Of Quantities (Divided Into 3 Construction Stages) - 2 Copies;10) Preparation Of The Investors Cost Estimate (Divided Into 3 Construction Stages) Along With Codes From The Cpv Common Procurement Vocabulary - 2 Copies;11) Updating The Investors Cost Estimate (Each Of The 3 Parts);12) All Necessary Arrangements And Opinions;13) Preparing Design Documentation Along With The Bill Of Quantities In An Electronic Version (Including The Original Version - In Which The Documentation Element Was Created, E.G. *Doc., *Dwg, *Shp., *Xls, *Ath. Etc.) - 2 Pendrives Or Cds/Dvds; 14) Performing Authors Supervision During The Implementation Of Construction Works, Carried Out On The