Common Market for Eastern and Southern Africa, COMESA,African Solidarity Fund (FSA),African Union
03-04-2026
Work Detail
Request for proposals for Construction Contractor for RW-3 Infrastructure Project. 2. Project Overview The RW-3 project supports Ziplines logistics and drone delivery operations. Construction activities may include: Warehouse and logistics infrastructure Office and operational buildings Drone launch and recovery zones Utility systems (power, water, septic systems, HVAC) Access roads and site drainage Prefabricated structures and operational tents All works shall follow approved engineering designs and technical specifications. Final designs and construction specifications will be provided during Stage 2 of the procurement process. 3. Scope of Work The contractor will be responsible for executing all works required to deliver the RW-3 infrastructure facility. 3.1 Site Mobilization and Preparation The contractor shall: Mobilize equipment and personnel Establish temporary site facilities Conduct site clearing and grading Perform excavation and earthworks Set out construction coordinates using appropriate surveying equipment Implement Health, Safety, and Environmental management procedures 3.2 Civil and Structural Works The contractor shall perform: Foundation works Reinforced concrete construction Structural steel works where required Masonry and building envelope construction Roofing installation Concrete slabs and pavements 3.3 Mechanical, Electrical and Plumbing (MEP) Works The contractor shall install: Electrical distribution systems Lighting systems Lightning protection systems Water supply systems Drainage and plumbing infrastructure Septic systems HVAC systems where applicable 3.4 External Works External works may include: Stormwater drainage systems Access roads and parking areas Site grading and landscaping Utility connections 3.5 Prefabricated Structure Installation The contractor will support the unloading and installation of prefabricated structures delivered to the site. Expected installation duration: 20 days, depending on site conditions and logistical arrangements. 3.6 Tent Installation Operational tents required for Zipline operations will be assembled and installed by the contractor in coordination with Zipline supervisors. Expected installation duration: approximately 5 days. 3.7 Drone Recovery and Launcher Installation Support The contractor will assist with preparation of bases and anchoring systems required for the drone recovery and launcher infrastructure. Specialized equipment such as a hydraulic stake rammer may be used for installing recovery system base plates where required. This equipment may be rented temporarily for installation activities. 3.8 Testing, Commissioning and Handover The contractor shall: Perform inspection and testing of installations Rectify defects identified during inspections Submit as-built documentation Provide operation manuals Complete final commissioning and handover Location: Kigali Deadline: Friday, 03/04/2026 17:00 [Disclaimer: The above text is machine translated. For accurate information kindly refer the original document.] Tender Link : https://www.jobinrwanda.com/job/request-proposal-rfp-construction-contractor-rw-3-infrastructure-project
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.