Construction Work For Water Projects – Attergau Flood Protection. Earthworks And Construction Work, Pipe Laying And River Engineering Work, Steel Hydraulic Engineering Work. The Project Consists Of 3 Retention Basins And A Local Railway Culvert. All 3 Retention Basins Have At Least 1 Concrete Structure. As Part Of The Construction Work On The Retention Basins, Not Only Are The Concrete Structures Built, But Also Dams Are Built And Any Road Construction Measures Are Implemented.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.