1. The Subject Of The Order Covered By This Procedure Is The Task Entitled: Development Of The Area Around The Multi-Functional Building. 2. The Works Include Development Of The Area Around The Multi-Purpose Building At Ul. Legionów Polskich 8 In Bochnia In The Field Of Road Transport, Parking Spaces, Playground And External Installations: Sanitary And Rainwater Sewage, Electrical Installations, External Lighting On Plot No.: 7546/44 Bochnia City Commune, Within The Registration Area 0005 Bochnia -5, Registration Unit 120101_1, Bochnia - City. There Is A New Multi-Functional Building On The Plot, Housing A Municipal Kindergarten, A Community Center For Seniors And Medical Offices. All Required Connections Have Been Made. The Construction And Development Of The Facility Area Is Carried Out On The Basis Of The Building Permit Decision Of The Bochnia Staroste No. 945/2020 Of October 16, 2020, Reference Number: Ab.6740.1.537.2020 - Approving The Construction Design (Hereinafter Referred To As The Primary Design) And The Building Permit Decision Of The Bochnia Staroste No. 727/2023 Of December 18, 2023, Reference Number: Ab.6740.1.651.2023 - Approving The Construction Design (Hereinafter: Replacement Design I), 3. The Works Should Be Carried Out Based On: 1) Decision On The Construction Permit Of The Bochnia Starosta No. 945/2020 Of October 16, 2020, Reference Number: Ab.6740.1.537.2020 - Approving The Construction Design (Hereinafter Referred To As The Original Design);2) Replacement Detailed Design Ii Regarding Land Development, Which Was Developed In Connection With Increasing The Number Of Parking Spaces. The Project Includes Changes Within Category Xxii - Parking Lots And Changes In Small Architecture, Plantings And Installations (As An Adjustment To Changes In The Communication System) And Does Not Cover Categories Ix And Xi (Building), With The Exception Of The Contractors Obligation To Finish The Area Where Doors And Windows Without Sills Meet The Pavement. Change Ii Of The Land Development Did Not Affect The Scope Of Demolition And Felling, Most Of Them Have Already Been Carried Out, There Are Still Elements Of Land Development And The Remains Of Installations To Be Demolished, As Well As A Few Trees.4. A Detailed Description Of The Subject Of The Order Includes: 1) Design Documentation, 2) Technical Specifications For The Execution And Acceptance Of Works, 3) Bill Of Quantities, 4) Draft Provisions Of The Contract.5. In Order To Properly Prepare The Offer, The Ordering Party Recommends Conducting A Site Visit.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.