The Work includes the installation of approximately 3,550 linear feet of 12" ductile iron water main, with approximately 248 linear feet of 8" ductile iron lateral mains, 1,445 linear feet of 1" copper service connections and replacement of 7 fire hydrants on Peach Street and Washington Street as indicated on the Contract Drawings. Temporary Bypass Systems will be required during construction.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.