Tenders Are Invited For Modernization Of The Moje Bosiko - Orlik 2012 Sports Complex With The Construction Of A Structure For Comprehensive Obstacle Running Training And Renovation Of The Locker Rooms And Sanitarions In The Zso In Bytów
Tenders Are Invited For Modernization Of The Moje Bosiko - Orlik 2012 Sports Complex With The Construction Of A Structure For Comprehensive Obstacle Running Training And Renovation Of The Locker Rooms And Sanitarions In The Zso In Bytów
Part I Of The Order - Modernization Of The Sports Complex Moje Boisko - Orlik 2012 Along With The Construction Of A Structure For Comprehensive Obstacle Course Training In The Zso In Bytów. The Scope Of Work Includes, Among Others: 1. Works/Demolition Works;2. Removal Of The Existing Surface From The Playing Fields And Disposal;3. Modernization Of The Multi-Purpose Sports Field - Synthetic Surface (19.10 X 32.10 M - 613 M2): - Construction Of A New Surface, - Painting Of Lines Separating Individual Sports Games, Multi-Purpose Sports Field, - Replacement Of Basketball Baskets (2 Pcs.); 4. Modernization Of The Football Pitch (30.1 X 61.9 M - 1863 M2): - Replacement Of The Synthetic Surface With A New One, Including Painting Lines Separating Individual Sports Games, - Replacement Of Goals (2 Pcs.);5. Modernization Of The Existing Fence Of The Playing Fields: - Painting Of The Existing Poles Of The Existing Columbine Fence (61 Pcs. - 4.08 M, 42 Pcs. - 6 M, 22 Pcs. Crossbars), - Replacement Of The Net Of Ball Catchers (Length 30.10 M, Height 6 M), - Replacement Of The Existing Double-Leaf Gate (Width 2.5 M X Height 2 M), - Replacement Of The Existing Wickets (3 Pcs, Width 1.23 X 2 M);6. Lighting Modernization: - Replacement Of Lighting Fixtures With New Led Ones (18 Pcs.);7. Construction Of Structures For Comprehensive Running Training: - Construction Of Reinforced, Poured Or Prefabricated Foundations, - Construction Of A Safe Surface - Thick Sand. 40 Cm (30 Cm + 10 Cm For Movement), - Concrete Curbs, - Purchase And Installation Of A Fitness Set, - Purchase And Installation Of A Time Measurement Button Totem; 8. Aboveground And Underground Protection Of Existing Trees;9. Making And Placing A Board Promoting The Task According To The Template Included In Appendix No. 13 To The Swz;10. Carrying Out A Post-Construction Geodetic Inventory. The Work Should Be Performed Based On The Design Documentation Prepared By Studio Projektowe To Green Paulina Mendela, Ul. Naruszewicza 24/4, 77-100 Bytów Pn. Modernization Of The Orlik 2012 Sports Field Complex With The Construction Of A Structure For Comprehensive Obstacle Course Training At The General Education School Complex In Bytów. The Investment In Question Is Located In The Bytów Commune, In The Town Of Bytów, Plot No. 19/6, Precinct 99 Bytów - City. The Plot Is The Area Of The General Education School Complex In Bytów. The Task Covered Is Co-Financing From The Fund For The Development Of Physical Culture, Administered By The Minister Of Sport And Tourism, As Part Of The Sports Complexes Modernization Program Moje Boisko-Orlik 2012 - 2025 Edition. A Detailed Description Of The Subject Of The Contract Is Set Out In The Following Attachments: - Annex No. 1 To The Swz - Description Of The Subject Of The Contract To Parts I And Ii - Annex No. 1A To The Swz - Design Documentation
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.