Tenders Are Invited For Construction Work For Water And Sewage Pipelines – Construction Of Nikšić Wastewater Management System – Sewerage Network Phase Ii
Tenders Are Invited For Construction Work For Water And Sewage Pipelines – Construction Of Nikšić Wastewater Management System – Sewerage Network Phase Ii
Construction Work For Water And Sewage Pipelines – Construction Of Nikšić Wastewater Management System – Sewerage Network Phase Ii. Construction Of A Wastewater Collection Network For Four Settlements Located At The North Of The City Centre (Dragova Luka, Ćemenca, Oštrovac And Rubeža). The Total Length Of The Network Is App 41 Km And Consists Of The Following Pipe Diameters And Manholes: • Ø 300 Mm, L=1,960 M • Ø 250 Mm, L=3,750 M • Ø 200 Mm, L=30,510 M • House Connections, Ø 200 Mm, L=5,000 M • Manholes, Total 3,600 Pcs Corrugated Pe Pipes Is The Collector’S Material And Concrete Is The Manhole Material. - Construction Of A New Sewerage Pumping Station Called Cemenca (Q=50 L/S; H=9 M, P=5 Kw), And A Pressure Line Diameter Of Ø200 Mm With A Length Of 165 M. The Wastewater Will Be Pumped Through The Pressure Line To The Existing Pumping Station Duklo. - Rehabilitation Of The Existing Pumping Station Duklo (Q=72 L/S; P=30 Kw). As Major Part Of The Rehabilitation Efforts, The Existing Manual Screen Will Be Replaced With An Automated One.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.