GTR 110611005

Tenders Are Invited For Engineering Design Services For The Construction Of Civil Engineering Works - Preparation Of Complete Design And Cost Estimate Documentation For The Implementation Of The Small Lowland Retention Project (Mrn3) In The Złoty Potok Forest District - 3Rd Procedure.

ICB — International Competitive Bid Closed central europe
Tender Information
GTR Reference
110611005
Tendering Authority
Subscribe to view
Tender No
188114-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Engineering Design Services For The Construction Of Civil Engineering Works - Preparation Of Complete Design And Cost Estimate Documentation For The Implementation Of The Small Lowland Retention Project (Mrn3) In The Złoty Potok Forest District - 3Rd Procedure.
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
22-04-2026 Closed
Work Detail
Engineering Design Services For The Construction Of Civil Engineering Works - Preparation Of Complete Design And Cost Estimate Documentation For The Implementation Of The Small Lowland Retention Project (Mrn3) In The Złoty Potok Forest District - 3Rd Procedure.. 1) The Subject Of The Order Is The Preparation Of Complete Design Documentation (Hereinafter Referred To As The Documentation) Along With Obtaining Opinions, Arrangements And Administrative Decisions Required By Construction Law, As Well As Performing Authors Supervision For The Following Task: Name Of The Task: Reconstruction Of Storage Reservoirs - Krasianów Ponds In The Dziadówki Forest District Task Description: Reconstruction Of The Retention Reservoir - Krasianów Ponds In The Dziadówki Forest District By Deepening It And Strengthening The Dikes And Securing Their Slopes With A Mesh Against Beavers Along With The Reconstruction Of Hydrotechnical Devices Area Of The Retention Area: 4.5 Ha Minimum Capacity Of Small Retention Facilities: 45,000.00 M3. Minimum Volume Of Retained Water: 25,000.00 M3. Administrative Addresses: Janów Commune - Rural Area, Ponik District, Plots No.: 582, 570 Forest Addresses: 02-38-1-09-110-C, 02-38-1-09-90 -L -00 - Forest Address May Change Due To The New Pul For The Years 2026-2035 Task Settlement Number: 02-38-1.1-01. The Data Included In The Description Of The Subject Of The Order In The Form Of Area, Capacity And Volume Should Be Treated As Minimal And Necessary To Be Obtained As Part Of The Project. The Ordering Party Allows For An Increase In The Indicated Parameters. Increasing The Above-Mentioned Parameters Will Not Result In An Increase In Order Fulfillment Costs. 2) The Subject Of The Order Includes: A) Obtaining A Set Of Legally Required Designs, Opinions, Decisions And Arrangements Necessary To Obtain A Final And Valid Decision On A Building Permit In Accordance With The Act Of July 7, 1994, Construction Law (Journal Of Laws Of 2025, Item 418) (Acting On Behalf Of The Ordering Party). B) The Contractor Is Obliged To Perform Authors Supervision In Proceedings For The Award Of Public Procurement Contracts For Construction Works And To Provide Answers To The Questions Asked Within 2 Business Days From Submitting The Questions For Development. C) Performing Authors Supervision Throughout The Entire Duration Of Construction Works, Including Checking Compliance Of The Works Carried Out With The Design Documentation With Applicable Legal Provisions And Standards, Clarifying Doubts Regarding The Construction And Executive Design And The Solutions Contained Therein, And Possibly Supplementing The Details Of The Design Documentation, Agreeing With The Ordering Party And The Construction Works Contractor On The Possibility Of Introducing Alternative Solutions To Those Provided For In The Design Documentation In Relation To Materials And Structures, As Well As Technical And Technological Solutions, And Reported By The Manager Construction Or The Investor Supervision Inspector. It Is Necessary To Supervise The Implementation To Ensure That The Scope Of The Changes Introduced Does Not Result In A Significant Change To The Approved Design And To Participate In Committees And Technical Meetings Organized By The Ordering Party. If Necessary, The Designer Will Be Required To Stay On Site To Check The Compliance Of Construction Works With The Design Solutions, Provide Appropriate Advice And Guidance.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
a13d908e-829b-4b06-a2f7-f7857c042ae2.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders