Manual Cleaning Of The Canal From Overgrown Weeds And Bushes, Silt Cleaning Of The Movcud Canal With An Excavator With A Capacity Of 0.65 M3, Excavation Of Group Ii Soil With An Excavator With A Capacity Of 0.65 M3 In Chalovu And Loading It Into A Self-Unloading Vehicle, Qruntun (Gil Qatinin) Avtomasmla 4.7 Km Mosafodon Dajinib Kanahn Yalagina Tokiilmosi, Wetting The Soil With 50% Water Before Molding, Quality Compaction Of The Casting Flat, Excavation Of Group Ii Pit With An Excavator With A Capacity Of 0.65 M3 And Throwing It Aside (Excavation Of The Project Cross-Section Of The Channel, Manual Leveling Of The Bottom And Slopes Of The Channel From Group I Soil, Placing A 10 Cm Thick Layer Of Sand And Gravel Under The Concrete, Laying Of Polyethylene Coating On The Bottom And Slope Of The Channel, The Price Of Polyethylene Cover, Providing Concrete Lining To The Bottom And Slope Of The Channel:, Longitudinal Laying Of Construction Seams With Bitumen Polymer Mastic, Excavation Of Group Ii Soil With An Excavator With A Capacity Of 0.65 M3 And Loading It Into An Automatic Machine (Clay Layer Suitable For Repairing The Collapsed Right And Left Embankment Of The Canal), Transporting The Loaded Soil By Car For A Distance Of 3.85 Km And Pouring It Into The Broken Right Dam Of The Canal
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.