Excavation Of Soil With Excavators With A Capacity Of 0.5 (0.5-0.63) M3 Of Chalovun By Loading It Onto Dump Trucks, Soil Group: 2, Dump Truck, 17 T Transport Distance - 5 Km. 1St Class Cargo, Execution Of Works At The Site Of Soil Spillage, Soil Group: 2-3, Mechanized Field Planning, Compaction Of The Soil In The First Pass On One Track With An 8 T Punch Trailer Roller, Layer Thickness: 15 Cm, During Each Subsequent Trip On A Track, You Must Add To The Norm 01-02-002-02 (Additional 3 Trips), Construction Of Paving And Leveling Layers Of Foundations: Sand-Gravel Mixture, Coarse Sand, Gravel Mix (Gravel, Gravel-Sand), Construction Of Foundations And Covers From Sand-Gravel Or Crushed Stone-Sand Mixtures: One Layer With A Thickness Of 12 Cm (Thickness-10 Cm), Natural Sand-Gravel Mixture
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.