1. The Subject Of The Procedure And Order Is To Select A Contractor For Construction Works Consisting In The Construction Of The Next Stage In The Park In Łagiewniki, As Part Of The Districts Civic Budget, For The Municipal Greenery Board In Krakow.1.1 Pursuant To Art. 310 Of The Public Procurement Act, The Ordering Party Provides For The Possibility Of Invalidating The Procedure In Question If The Public Funds That The Ordering Party Intended To Allocate To Finance All Or Part Of The Order Were Not Granted To It.1.2 The Subject Of The Procedure And Order Is An Investment Related To The Implementation Of The Tasks Of The Participatory Budget Entitled: Zzm/O1.217/25 Park In Łagiewniki - Stage Vii, Zzm/O1.109/26 Park In Łagiewniki - Stage Viii Civic Budget Of Districts - Xii Edition, Zzm/O1.110/26 Replacement Of The Playing Field Surface In The Park In Łagiewniki, Zzm/O1.112/26 Modernization Of The Jordan Garden For Children - Ul. Fredry.1.3 The Investment Area Is Located On Plot No. 82/95, District P-47, Unit Records: Podgórze. 1.4 As Part Of The Order, The Following Should Be Performed In Particular: Preparation Of The Investment Area, Demolition Works Including, Among Others, Demolition Of The Concrete Surface Of The Pitch, The Edges, Dismantling Of Small Architecture Objects (Force Equipment, Benches, Waste Bins, Volleyball Posts And Football Goals), Construction Of An Epdm Surface Of The Pitch, Construction Of A Surface Of Concrete Slabs, Construction Of A Paving Stone Surface, Construction Of Ball Catches, Football Goals (1 Set), Volleyball Poles (1 Set), Delivery And Assembly Of Small Architecture Objects, Including: Benches With Backrests (4 Pcs.), Benches Without Backrests (6 Pcs.), Waste Bins (4 Pcs.), Tables With Benches (3 Sets), Bicycle Racks (4 Pcs.), Deckchairs (6 Sets), Hammocks (4 Sets), Chess Tables (2 Sets), Dog Run Elements: Jumping Rings (1 Set), Balance Beam (1 Set), Swing (1 Set), Slalom Poles (1 Set); Fences With Gates (6 Pcs.), Outdoor Gym Equipment: Runner And Elliptical Trainer (1 Set), Stepper And Twister (1 Set), Rider Bike (1 Set); Playground Equipment: Jumping Set (1 Set), Balancing Posts (1 Set), Balance Beam (1 Set), Movable Bridge (1 Set), Balance Beam - Rocker (1 Set), Board With Regulations (1 Pc.), Citizens Budget Signs (2 Pcs.); Land Clearing And Recultivation; Preparation Of As-Built Documentation.1.5 The Works Should Be Carried Out In Accordance With The Design Documentation, Technical Specification For The Execution And Acceptance Of Construction Works (Abbreviated As Stwiorb) And In Accordance With The Attached Graphic Attachments.1.6 An Integral Part Of The Swz Necessary For The Execution Of The Subject Of The Order Are The Materials Attached To The Swz, In Particular The Design Documentation Together With Arrangements, Description Of The Subject Of The Order, Stwiorb, Bills Of Quantities, Tables Of Manufactured Elements (Maintenance, Assets), Patterns Material Approval Cards, Templates Of Subcontracting D