GTR 110530379

Tenders Are Invited For Turbines And Motors – Manufacture, Supply And Maintenance Of A Gas Turbine

ICB — International Competitive Bid Closed Western Europe
Tender Information
GTR Reference
110530379
Tendering Authority
Subscribe to view
Tender No
179484-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Turbines And Motors – Manufacture, Supply And Maintenance Of A Gas Turbine
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
15-04-2026 Closed
Work Detail
Turbines And Motors – Manufacture, Supply And Maintenance Of A Gas Turbine. Stawag Operates An Extensive District Heating Network In Aachen. As Part Of The Network Expansion And The Transformation To Renewable Heat Generation, The Above-Mentioned Combined Heat And Power Plant (Hkw) Was Planned. The Installation Location Is A Former Industrial Site In The East Of Aachen. The Hkw Is A Gas Turbine Thermal Power Plant With Additional Firing. The Gas Turbine Package Forms The Central Element And Generates Electricity And Heat. The Net Electricity Is Fed Into The Public Power Grid. The Turbine Exhaust Goes Into A Waste Heat Boiler With Additional Firing, Which Produces Hot Water For The District Heating Network. The Hkw Is Mainly Used On Colder Days And Also Has A Reserve Function. A New Building Is Being Built For The Hkw. The Fuel For The Gas Turbine Is Initially Natural Gas H. In The Long Term, The Plan Is To Switch To Hydrogen. In Order To Enable Hydrogen Admixtures In The Medium Term, The Gas Turbine Package Described Here Should Be Able To Process Up To 20% H2 Content. In The Long Term, It Should Be Possible To Carry Out A Later, Optional Conversion To Pure Hydrogen Operation (100%). The Subject Of This Process Is The Production, Delivery And Future Maintenance Of A Gas Turbine Package For Generating Electricity And Heat With Approx. 14 Mw Gross Output. The Gas Turbine Package Forms Project 1 Of The Construction Project. The Other Projects (E.G. Waste Heat Boilers, Gas Compressors, Buildings) Are Planned, Tendered, Awarded And Built Separately By Stawag. The Planning And Construction Of The Further Projects Will Be Coordinated With The Gas Turbine Package. Commissioning Of The Gas Turbine Is Planned For 2029, With Acceptance Of The Entire System Planned For June 2029.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
6eaff19d-3cc6-450d-aec7-07e9b2f89650.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders