Tenders Are Invited For Steam-Generation Plans Construction Work – Project: Tiefstack Transformation (Titra) - Operation With Gas (Bmg) - Award Unit (Lot) 6 Boiler Pressure Part Modification
Tenders Are Invited For Steam-Generation Plans Construction Work – Project: Tiefstack Transformation (Titra) - Operation With Gas (Bmg) - Award Unit (Lot) 6 Boiler Pressure Part Modification
Steam-Generation Plans Construction Work – Project: Tiefstack Transformation (Titra) - Operation With Gas (Bmg) - Award Unit (Lot) 6 Boiler Pressure Part Modification. The Aim Of Lot 6 Is To Adapt The Pressure Part Of Both Steam Generators To Future Natural Gas Operation By: - Replacing Impermissible Pressure Part Components In The Superheater Area (Ü2, Ü3, Ü4) With New Components With Suitable Materials And Design In Accordance With Trd, - Ensuring The Permissible Pipe Wall Temperatures And Stresses For All Relevant Load Cases Ensuring The Permissible Pipe Wall Temperatures And Stresses For All Relevant Load Cases (100%, 70%, 40% Load, One/Two Boiler Operation) - Integration Of The New Components Into The Existing Boiler Including Static Verification, Welding Technology, Tests And Ibs
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.