Tenders Are Invited For Construction Work – Tender For Locksmith/Steel Construction Work (317) For The New Building Of The Akk (Copy)

Tender Detail

110501320
180111-2026
Self-Funded
Tenders Are Invited For Construction Work – Tender For Locksmith/Steel Construction Work (317) For The New Building Of The Akk (Copy)
NCB
Western Europe
European Union,G20
13-04-2026

Work Detail

Construction Work – Tender For Locksmith/Steel Construction Work (317) For The New Building Of The Akk (Copy). 1St Floor: On The 1St Floor, North Wing, The Conversion Will Create 8 Additional Patient Rooms Within The Existing Building Volume. It Is Possible To Set Up An Additional Bed For An Accompanying Person In Each Room. Each Patient Room Has Its Own Bathroom. The New Spatial Concept Entails An Adjustment For The Entire Floor Including The South Wing, As The Station Processes For Operating The North Wing Have To Be Reorganized. This Applies To The Following Rooms: 1.39 Laundry Storage, 1.20 Parent Stay/Play. To Connect The New Areas To The Existing Building, Suspended Ceilings Are Dismantled And Reinstalled, Including In The Hallways. In Order To Create The Necessary Escape Routes, The Temporary External Staircase Will Be Replaced By A Permanent External Staircase As Part Of The Renovation. It Is Also Led To The Roof Area Above The 1St Floor For Maintenance Purposes. To Prevent Fire From Spreading To The Stairs, A Fire Barrier Is Installed. The Static System Of The Existing Building Is Based On An Identical Position Of The Load-Bearing Walls On The Ground And Upper Floors. This Cannot Be Easily Implemented Due To The New Spatial Program And The Resulting Floor Plan. The Previous Load Transfer Through Load-Bearing Walls Will Be Changed. Beams And Supports Are Installed To Transfer Loads. Ground Floor: Based On The Existing Structure, Two Shared Bathrooms Will Be Converted Into Two Individual Bathrooms For Hygiene Reasons. Currently, In The Event Of An Infection, The Shared Bathrooms Must Be Closed To The Non-Infected Side. In The Clinical Ventilation Areas On The Ground Floor, 2 Patient Bathrooms Are Shared, Creating 4 Patient Bathrooms. The Changed Load Transfer Requires The Installation Of An Additional Support In The Area Where The Parents Stay. In Individual Areas, Interventions In The Existing Tga Installations Are Necessary. To Do This, Existing Ceilings Must Be Opened And Closed Again. Basement: The Changed Load Transfer Requires The Installation Of Two Additional Supports In Front Of And In The Area Of ​​The Room Of Silence. Construction: Non-Load-Bearing Interior Walls: Plasterboard Stud Walls, Designed According To Fire And Moisture Protection Requirements. The Beam Below The Ceiling Above The 1St Floor Is Made As A Steel Support Structure. The Supports Below The Beam On The 1St Floor As Well As The Additional Supports On The Ground Floor And Basement Are Designed As Steel Supports. Steel Beams And Steel Columns On All Floors Receive A Fire Protection Coating. The External Staircase Including A Fire Protection Bulkhead In Lightweight Construction Is Intended As A Steel Stringer Staircase With Grating Steps And Platforms. More Detailed Details Can Be Found In The Tender Documents (In Particular The List Of Services).

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document 943da2a5-adc8-4ff8-9a26-5aad4f77f372.html
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail