Tenders Are Invited For Construction Of 1 Reinforced Concrete Road, 0.398 Km Long, 5.5 M Wide, 0.15 M Thick Concrete, Using 8 Mm Steel Cross Section. And Fill The Red Soil, Shoulder Width 0.3 M Wide, Watered And Compacted By Elephant Foot Or Soil Compactor - The Floor Should Be Paved With Clear Plastic Rubber - The First Foundation Layer Should Be Filled With Red Gravel 0.10 M Thick - The Second Foundation Layer Should Be Filled With Paving Stone (Concrete) Thickness 0.15 M - Concrete Work Can Be Used For Concrete Road The Work Of Pouring Concrete Road Must Be 0.20 Meters Wide And 0.75 Meters High. 0.5 M Long And 19 Mm Pvc Pipe. 0.5 M Long And 0.40 M Apart - Do Not Push The Cart Or Drive A Concrete Mixer Truck Over The Horizontal And Vertical Rails - The Recipient Must Cover The Concrete With A Sack Or Filter Cloth And Water For At Least 7 To 10 Days After Removing The Mold.
Tenders Are Invited For Construction Of 1 Reinforced Concrete Road, 0.398 Km Long, 5.5 M Wide, 0.15 M Thick Concrete, Using 8 Mm Steel Cross Section. And Fill The Red Soil, Shoulder Width 0.3 M Wide, Watered And Compacted By Elephant Foot Or Soil Compactor - The Floor Should Be Paved With Clear Plastic Rubber - The First Foundation Layer Should Be Filled With Red Gravel 0.10 M Thick - The Second Foundation Layer Should Be Filled With Paving Stone (Concrete) Thickness 0.15 M - Concrete Work Can Be Used For Concrete Road The Work Of Pouring Concrete Road Must Be 0.20 Meters Wide And 0.75 Meters High. 0.5 M Long And 19 Mm Pvc Pipe. 0.5 M Long And 0.40 M Apart - Do Not Push The Cart Or Drive A Concrete Mixer Truck Over The Horizontal And Vertical Rails - The Recipient Must Cover The Concrete With A Sack Or Filter Cloth And Water For At Least 7 To 10 Days After Removing The Mold.
Association of Southeast Asian Nations, ASEAN,APAC (Asia Pacific)
01-04-2026
Work Detail
Construction of 1 reinforced concrete road, 0.398 km long, 5.5 m wide, 0.15 m thick concrete, using 8 mm steel cross section. And fill the red soil, shoulder width 0.3 m wide, watered and compacted by elephant foot or soil compactor - The floor should be paved with clear plastic rubber - The first foundation layer should be filled with red gravel 0.10 m thick - The second foundation layer should be filled with paving stone (concrete) thickness 0.15 m - Concrete work can be used for concrete road The work of pouring concrete road must be 0.20 meters wide and 0.75 meters high. 0.5 m long and 19 mm PVC pipe. 0.5 m long and 0.40 m apart - Do not push the cart or drive a concrete mixer truck over the horizontal and vertical rails - The recipient must cover the concrete with a sack or filter cloth and water for at least 7 to 10 days after removing the mold.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.