Tenders Are Invited For Construction Of 3 Main Concrete Roads, 0.356 Km Long, 5 M Wide, 0.15 M Thick Concrete, Using Steel Rods With A Diameter Of 8 Mm. And Fill The Red Soil, Shoulder Width Of 0.5 M, Be Watered And Compressed By Elephant Foot Or Soil Compactor - The Floor Should Be Paved With Clear Plastic Rubber - The First Foundation Layer Should Be Filled With Red Gravel 0.1 M Thick - The Second Foundation Layer Should Be Filled With 0.1 M Thick Concrete Paving - Concrete Work Can Be Used With Concrete Or Concrete Be Sure To Tie A 0.2-Meter-Wide Piece Of Steel And Place The Pile Correctly At A Height Of 0.75 Meters. A 20-Meter Joint Extension Work Requires The Use Of 14 Mm Cane Bars. 0.5 M Long And 19 Mm Pvc Pipe. 0.5 M Long And 0.4 M Apart - Do Not Push Carts Or Rollers Or Concrete Mixers On Top Of Transverse And Longitudinal Beams - The Recipient Must Cover The Concrete With A Sack Or Filter Cloth And Water For At Least 7 To 10 Days After Removing The Mold.
Tenders Are Invited For Construction Of 3 Main Concrete Roads, 0.356 Km Long, 5 M Wide, 0.15 M Thick Concrete, Using Steel Rods With A Diameter Of 8 Mm. And Fill The Red Soil, Shoulder Width Of 0.5 M, Be Watered And Compressed By Elephant Foot Or Soil Compactor - The Floor Should Be Paved With Clear Plastic Rubber - The First Foundation Layer Should Be Filled With Red Gravel 0.1 M Thick - The Second Foundation Layer Should Be Filled With 0.1 M Thick Concrete Paving - Concrete Work Can Be Used With Concrete Or Concrete Be Sure To Tie A 0.2-Meter-Wide Piece Of Steel And Place The Pile Correctly At A Height Of 0.75 Meters. A 20-Meter Joint Extension Work Requires The Use Of 14 Mm Cane Bars. 0.5 M Long And 19 Mm Pvc Pipe. 0.5 M Long And 0.4 M Apart - Do Not Push Carts Or Rollers Or Concrete Mixers On Top Of Transverse And Longitudinal Beams - The Recipient Must Cover The Concrete With A Sack Or Filter Cloth And Water For At Least 7 To 10 Days After Removing The Mold.
Association of Southeast Asian Nations, ASEAN,APAC (Asia Pacific)
26-03-2026
Work Detail
Construction of 3 main concrete roads, 0.356 km long, 5 m wide, 0.15 m thick concrete, using steel rods with a diameter of 8 mm. And fill the red soil, shoulder width of 0.5 m, be watered and compressed by elephant foot or soil compactor - The floor should be paved with clear plastic rubber - The first foundation layer should be filled with red gravel 0.1 m thick - The second foundation layer should be filled with 0.1 m thick concrete paving - Concrete work can be used with concrete or concrete Be sure to tie a 0.2-meter-wide piece of steel and place the pile correctly at a height of 0.75 meters. A 20-meter joint extension work requires the use of 14 mm cane bars. 0.5 m long and 19 mm PVC pipe. 0.5 m long and 0.4 m apart - Do not push carts or rollers or concrete mixers on top of transverse and longitudinal beams - The recipient must cover the concrete with a sack or filter cloth and water for at least 7 to 10 days after removing the mold.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.