Watermain Replacement Reed Road . The Contract Is Generally For The Following Work: The Owner Is Undertaking A Water System Upgrade Involving The Following: • Installation Of Approximately 900 Meters Of New 300Mm Ductile Iron And High-Density Polyethylene (Hdpe) Piping And Abandon Segments Of 200 Mm Diameter Aging Asbestos Cement Water Main. • Installation Of New Water Service Connection Pipe, Hydrants, And Mechanical Fittings, With Alignment Adjustments Along Reed Road To Connect To The Existing Infrastructure. • Installation Of New Hdpe Waterline Segments At All Roadway Storm Culvert Crossings Will Be Completed Using Hdpe Pipe. • Removal And Disposal Of All Exposed Interfering Asbestos Pipe. Pipe To Be Safely Removed And Disposed Of In Accordance With Applicable Permit Requirements. • Implementation And Adherence To All Environmental Protection Monitoring And Measures, Including Preparation And Adherence To A Construction Environmental Management Plan (Cemp). • Full Lane Pavement Restoration, Including Roadway Milling And Repaving To Match Existing Asphalt Conditions, Followed By Final Line Painting Is Included In This Scope Of Work. • The Owner Is To Supply Some Materials Shown In The Attachment Owner Supplied Materials.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.