Wellington Breakwater West Foundation Cap And Tower Replacement . Canadian Coast Guard (Ccg) Has A Requirement To Replace An Existing 20’ “Claymar” Tower At The Ll490.5 Wellington Breakwater West Site. As Part Of This Replacement, A New Concrete Cap Is Required In Order To Level Out The Existing Concrete Foundation Which Is Currently Leaning. New Tower Shall Be A 20’ “Claymar” Tower Of Similar Likeness To The Existing. Work Under This Contract Includes But Is Not Limited To The Provision Of All Labour, Materials, And Equipment Required To: • Removal Of Existing “Claymar” Tower • Supply And Installation Of Concrete Cap Onto Existing Foundation Including; A) Supply And Installation Of Rebar Dowels To Tie Existing Foundation To Concrete Cap B) Supply And Installation Of Formwork 4” Above Highest Point Of Existing Concrete Cap • Supply And Installation Of Anchor Bolts For New “Claymar” Tower; • Transport New “Claymar” Toer From Ccg Prescott Base To Site; • Install New “Claymar” Tower Onto New Anchor Bolts; • Installation Of Rip-Rap To Match Existing Breakwall, Around Existing Foundation.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.