1.3 Description Of The Contract: 1.3.1 For Task No. 1, I.E. - Comprehensive Renovation Of The 7Th And 10Th Floor In The Student Seafarers House Pasat Of The Maritime University Of Technology In Szczecin At Ul. Starzyńskiego 9 In Szczecin, Including: 1) Construction Works - Demolition And Dismantling Works, Brickwork, Works Involving The Dismantling Of Floor Coverings, Plastering, Painting And Cladding Works Floor Tiles, Pvc Floor Coverings, Construction Of New Wall Coverings With Ceramic Tiles, Construction Of Plasterboards, Installation Of Doors And Windows, Etc., 2) Sanitary Works - Dismantling Works, Works In The Field Of Installation Of Water, Sewage And Central Heating Systems, Installation Of Sanitary Equipment, Acceptance Works - Tightness Tests, 3) Electrical Works - Dismantling Works, Laying Cables In Grooves, Installation Of Switches, Fixtures Lighting, Installation Of Sockets, Boxes, Cables, Measurements, Tests, Etc. 1.3.1.1 Description Of The Employers Requirements For Task No. 1 In Terms Of Implementation And Acceptance Are Determined By: 1) Description Of The Subject Of The Order And Technical Specifications For The Execution And Acceptance Of Construction Works - Opz And Stwiorb (Appendix No. 7.1 To 7.4 Swz): A) Annex No. 7.1 To Swz Opz, Pasat Construction Industry, B) Attachment No. 7.2 To Swz Stwiorb Construction Industry Pasat, C) Attachment No. 7.3 To Swz Stwiorb Sanitary Industry Pasat, D) Attachment No. 7.4 To Swz Stwiorb Electrical Industry Pasat, 2) Bill Of Quantities Of Works (Appendix No. 8.1 To 8.3 To Swz), A) Annex No. 8.1.1 To Swz - Bill Of Quantities For Construction Works Pasat 7Th Floor, B) Annex No. 8.1.2 To Swz - Bill Of Quantities For Construction Works Pasat 10Th Floor, C) Annex No. 8.2 To Swz - Bill Of Quantities For Pasat Sanitary Works, D) Annex No. 8.3 To Swz - Bill Of Quantities For Pasat Electrical Works, 3) Annex No. 9 To Swz - Pasat Drawing Documentation, 4) Designed Provisions Of The Contract Specified In The Contract Template Constituting Annex. No. 6 To The Swz (Template For Both Tasks). Note: The Contractor Will Be Obliged To Submit To The Ordering Party On Construction Product Approval Cards Detailed Information Regarding The Materials Planned To Be Incorporated, Along With The Source Of Production And Appropriate Quality Test Certificates, Attestations, Certificates, Declarations Of Use Properties And Other Documents Approving The Product For Use In Construction, For Their Approval By The Supervision Inspector, In Accordance With The Template Set Out In Annex No. 9 To The Agreement, No Later Than 5 Days Before The Planned Use Of A Given Product, With The Exception Of Key Construction Materials, In Particular: Doors And Windows, Complete Construction Product Sheets Of Which Must Be Submitted To The Ordering Party Within 20 Days From The Date Of Signing The Contract. Until The Product Is Approved By The Investors Supervision Inspector, The Contractor Bears Full Responsibility For Its Prior Ordering A