The Order Covers The Revitalization Of The Center Of Oleśnica Through: 1) Development Of A Recreational And Recreation Area In The Oleśnica Commune, Plot No. 188/4, 189/1, 189/2, 190/1, 2) Modernization Of A Multi-Purpose Sports Field Located In The Oleśnica Commune, Plot No. 1544/2, 3) Demolition Of The Building Located On Plot No. 1257, Oleśnica District, Intended For Road Widening, 4) Construction Of A Road On Plots No. 1257 And 1592 In Oleśnica Commune. Oleśnica,5) Reconstruction Of The Internal Road On Plot No. 1278/8 In Oleśnica,6) Modernization Of Street Lighting In The Center Of Oleśnica,7) Revitalization Of The Park In The Center Of Oleśnica On Plot No. 1277/2.8) Construction Of An Automatic Public Toilet In The Center Of Oleśnica On Plot No. 1277/1.9) Arrangement Of A Park For Seniors At Ogrodowa Street In Oleśnica, Plot No. 1306.10) Construction Of Permanent Traffic Signs In The Center Of Oleśnica And Performance Of Other Works Ensuring Proper Execution Of The Subject Of The Order In Accordance With The Description Of The Subject Of The Order Constituting Appendix No. 12 To The Swz, Together With The Annexes, I.E.: 1. Design Documentation.2. Bill Of Quantities.3. Detailed Technical Specifications.2. The Subject Of The Order Also Includes: 1) Preparation By The Contractor Of A Temporary Traffic Organization Project And Its Approval In Accordance With Applicable Regulations Before The Commencement Of The Works; 2) Ensuring Proper Protection, Fencing And Marking Of The Construction Site And Proper Organization Of Pedestrian Traffic During The Works; 3) Securing The Existing Greenery Against Damage Or Destruction During The Works, At The Same Time The Contractor Will Ensure That The Works In The Field Of Greenery Are Carried Out By A Specialist Company Or By Itself With The Consent Of The Employers Representative 4) Surveying Services Along With An Inventory As-Built, 5) Tidying Up The Construction Site And Handing It Over To The Ordering Party On The Day Of Final Acceptance Of The Works, 6) Providing As-Built Documentation (As-Built Cost Estimate, Declarations, Etc.), 7) Full Liability Of The Contractor For Violating Environmental Protection Regulations On The Construction Site And In The Area Adjacent To The Construction Site, As Well As For Waste Management To The Extent That Completely Exempts The Ordering Party From This Liability, 8) Placing The Ordering Party At The Place Where The Works Are Carried Out (Market, Sports Field, Senior Park, Square Behind The Kindergarten) Two Pieces Of Double-Sided Free-Standing Information Boards And Two Pieces Of One-Sided Hanging Information Boards, Informing About The Financing Of The Investment From The Polish Government Fund: Strategic Investment Program. Detailed Requirements For The Implementation Of The Contract In Question Are Also Specified In The Draft Contract, Constituting Annex No. 11 To The Swz.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.