GTR 110481723

Tenders Are Invited For Construction Works For Plants, Mining And Manufacturing And For Buildings Relating To The Oil And Gas Industry – Kommunale Energieverutilierung Schwaben Gku, Sewage Sludge Upcycling Plant, Ktk Plant

ICB — International Competitive Bid Closed Western Europe
Tender Information
GTR Reference
110481723
Tendering Authority
Subscribe to view
Tender No
174695-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Works For Plants, Mining And Manufacturing And For Buildings Relating To The Oil And Gas Industry – Kommunale Energieverutilierung Schwaben Gku, Sewage Sludge Upcycling Plant, Ktk Plant
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
02-04-2026 Closed
Work Detail
Construction Works For Plants, Mining And Manufacturing And For Buildings Relating To The Oil And Gas Industry – Kommunale Energieverutilierung Schwaben Gku, Sewage Sludge Upcycling Plant, Ktk Plant. The Schwaben Municipal Energy Utilization Gku Would Like To Build A Production Hall Including An Administration Building For Sewage Sludge Drying With Pyrolysis In The Immediate Vicinity Of The Sewage Treatment Plant In Buchloe For The Sustainable Preparation/Further Processing Of Sewage Sludge (From The Companys Own Sewage Treatment Plants). The Subject Of The Tender Is The Construction Of A Sewage Sludge Drying And Carbonization Plant (Ktk Plant) Including Engineering. In Addition, Inspection, Maintenance And Repair Of The System Are Commissioned. The Municipal Energy Utilization Schwaben Gku Is Planning To Build A Sewage Sludge Drying And Carbonization Plant (Ktk Plant) In Buchloe To Utilize Sewage Sludge From Around Twenty Sewage Treatment Plants. The System Is To Be Completely Rebuilt On Two Streets And Set Up In A New Operating Hall. The Entire Recycling Plant Must Be Designed For Fully Automated 24-Hour Operation, Seven Days A Week. The Availability Of Each Individual Road, Without Maintenance Work, Must Be At Least 91% And Thus Achieve An Annual Operating Time Of 8000 H/A. As A Rule, Both Roads Run Parallel In Full Or Partial Load Operation. The Sewage Sludge Dryer Is Supplied With Heat Using Heating Water With A Temperature Of 90 - 95 °C, Which Is Provided On Site. Approximately 50% Of The Heat Required For Drying Should Be Supplied By The Waste Heat From The Carbonization System. The On-Site Heat Supply Is Designed In Such A Way That The Heat Energy Required For Commissioning And Re-Commissioning After Maintenance Work Is Completely Covered By The On-Site Heat Supply. With The Planned Ktk Plant, Both Anaerobically And Aerobically Stabilized, Dewatered Sewage Sludge From Around Twenty Nearby Sewage Treatment Plants Can Be Dried And Carbonized In An Economical And Environmentally Conscious Manner. The Planned Ktk Plant Is Designed For The Following Sewage Sludge Quantities And Qualities: - Annual Throughput: 12,000 T/A Dewatered Sewage Sludge With 25% Tr Or On Average: 375 Kg/H Tr, Max. 400 Kg/H Tr On Average: 417 Kg/H, Max. 444 Kg/H Dried Sewage Sludge At 90% Tr - Operating Hours/Availability: 8,000 Bh/A - Hourly Drying Throughput: Max. 1,600 Kg/H Sewage Sludge With 25% Tr. Furthermore, The Service Description As Well As The Procurement And Contract Documents Are Referred To.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
b1181b35-314e-493c-9c41-d8ab76764247.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders