GTR 110455750

Request For Quotation Purchase Of Other Supplies, Household Goods With Delivery

ICB — International Competitive Bid Closed Central Asia
Tender Information
GTR Reference
110455750
Tendering Authority
Subscribe to view
Tender No
16578799
Financer Name
Self-Funded
Work Title
Request For Quotation Purchase Of Other Supplies, Household Goods With Delivery
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Asia
Political Region
Commonwealth of Independent States, CIS
Last Date of Bid Submission
18-03-2026 Closed
Work Detail
Chlorine Tablets, 300 Pcs./Pack (Disinfectant Is Intended For Disinfection Of Surfaces Of Equipment, Inventory) Composition: Sodium Salt Of Dichloroisocyanuric Acid - 84.0% As An Active Ingredient, As Well As Adipic Acid - 8.0%, Sodium Carbonate - 8%., Bucket Made Of Galvanized Steel, Volume 12 L. The Product Must Be For A Purpose! Not Used Previously. Without Any Damage. The Delivery Period According To The Public Procurement Agreement Is Within 15 Calendar Days After The Entry Into Force Of The Agreement. Place Of Delivery Of Goods: Rk, Abay Region, Abay District, Karaul Village, Yeraly Street, 6. The Supplier Must Deliver The Goods To The Destination. Transportation Of Goods To The Destination Is Carried Out And Paid By The Supplier, And The Associated Costs Are Included In The Contract Price. Delivery Of Goods Must Be Carried Out In The Presence Of A Representative Of The Supplier. The Customer Or His Representatives May Control And Check The Supplied Goods For Compliance With The Requirements Specified In This Technical Specification. In This Case, All Costs For These Checks Are Borne By The Supplier. The Goods Supplied Must Comply With The Technical Specifications. Technical Requirements: If The Results Of The Supplied Goods During Inspection Are Found To Not Comply With The Requirements Of The Technical Specification, The Supplier Takes Measures To Eliminate The Non-Compliance With The Requirements Of The Technical Specification, Without Any Additional Costs On The Part Of The Customer, Within 5 Days From The Date Of Inspection., Cloth For Washing Floors, Non-Woven, On A Roll 2 Meters Wide, Length At Least 80 Meters. Cotton Rags, For Cleaning. Composition: 100% Cotton. Density: Not Less Than 120 G/M2. Roll Width At Least 200 Cm (2.0 M), Length 80 Meters, Sodium Hypochlorite Grade A White 1 Liter In A Plastic Bottle, For Cleaning And Disinfection Of Premises), Broom With Dustpan The Brush Is Attached To A Long Handle With A Hinge, Which Allows Sweeping At Any Angle. The Long, Thick Bristles Of The Brush Are Made Of High-Tech Synthetic Material: Soft But Elastic, It Gently Pushes Particles Of Debris Towards The Dustpan, And The Smallest Of Them, Those That Rise Into The Air When Sweeping, Seem To Be Magnetized. A Closed Scoop With A Collecting Scraper At The Bottom Ensures Easy Collection Of Garbage And Allows You To Bring It To The Garbage Disposal Without Spilling Or Being Blown Out By A Random Draft. For Convenient Storage, The Brush Is Connected To The Dustpan With A Special Holder On The Handle: The Design Is Compact And Stable. Contents: Scoop - 1 Pc. Broom - 1 Pc. The Floor Cleaning Brush Has A Width Of 120 Mm And A Bristle Length Of 40 Mm, Thanks To Which It Penetrates Even Hard-To-Reach Places., Floor Cleaning Liquid, At Least 1 Liter In One Bottle, Gloves For Hand Protection, Nitrile, Oil And Petrol Resistant Without Fabric Backing Silicone Gloves. For Household Needs. Dense. Size L. Gost 20010-93 Delivery Time According To The Public Procurement Agreement Is Within 15 Calendar Days After The Entry Into Force Of The Agreement. Place Of Delivery Of Goods: Rk, Abay Region, Abay District, Karaul Village, Yeraly Street, 6. The Supplier Must Deliver The Goods To The Destination. Transportation Of Goods To The Destination Is Carried Out And Paid By The Supplier, And The Associated Costs Are Included In The Contract Price. Delivery Of Goods Must Be Carried Out In The Presence Of A Representative Of The Supplier. The Customer Or His Representatives May Control And Check The Supplied Goods For Compliance With The Requirements Specified In This Technical Specification. In This Case, All Costs For These Checks Are Borne By The Supplier. The Goods Supplied Must Comply With The Technical Specifications. Technical Requirements: If The Results Of The Supplied Goods During Inspection Are Found To Not Comply With The Requirements Of The Technical Specification, The Supplier Takes Measures To Eliminate The Non-Compliance With The Requirements Of The Technical Specification, Without Any Additional Costs On The Part Of The Customer, Within 5 Days From The Date Of Inspection.
Key Value
Tender Value
82,500 - KZT
Tender Documents
Global Tender Document
80661b9b-ba79-4374-ac6d-79a98c4f91ad.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders