Tenders Are Invited For Pipeline-Design Services – Preparation Of Design Documentation For The Reconstruction Of The 2Xdn80 Foam Concrete Heating Network At Ul. March 19, 1981/Ul. Parkowa And 2Xdn80, 2Xdn50 At Ul. Gdańska 20 In Bydgoszcz
Tenders Are Invited For Pipeline-Design Services – Preparation Of Design Documentation For The Reconstruction Of The 2Xdn80 Foam Concrete Heating Network At Ul. March 19, 1981/Ul. Parkowa And 2Xdn80, 2Xdn50 At Ul. Gdańska 20 In Bydgoszcz
Pipeline-Design Services – Preparation Of Design Documentation For The Reconstruction Of The 2Xdn80 Foam Concrete Heating Network At Ul. March 19, 1981/Ul. Parkowa And 2Xdn80, 2Xdn50 At Ul. Gdańska 20 In Bydgoszcz. The Subject Of The Order Is: Development Of Design Documentation For The Reconstruction Of The 2Xdn80 Foam Concrete Heating Network At Ul. March 19, 1981/Ul. Parkowa And 2Xdn80, 2Xdn50 At Ul. Gdańska 20 In Bydgoszcz. The Subject Of The Order Includes, Among Others: 1) Preparation Of A List/List Of Studies Included In The Set Of Submitted Design Documentation, 2) Obtaining A Map For Design Purposes; Preparation Of A Construction Design In Accordance With The Local Spatial Development Plan And A Study Of Conditions And Directions Of Spatial Development (4 Copies In Paper Version, 1 Copy In Electronic Version), Along With All Arrangements And Permits (Including Acceptance Of The Proposed Network Route And Connections And Obtaining The Consent Of Land Owners For Temporary Occupation During The Implementation Of The Task, Zud Arrangements) Along With Obtaining A Valid Building Permit Or Confirmation Of Acceptance Of The Works Notification. In The Case Of Plots On Which The Network Is Designed And Plots To Which Entry Will Be Necessary For The Proper Conduct Of Construction Works, The Designer Is Obliged To Obtain A Declaration From The Owner Consenting To The Temporary Occupation Of The Land. Any One-Off Fee, Compensation, Etc. Will Be Estimated By The Ordering Party Based On The Graphic Material, Strip Width And Other Factors As Well As The Assumed Value Of 1 M2 Of Land. Regarding Financial And Material Obligations, Talks And Negotiations Will Be Conducted By A Representative Of Kpec Sp. Z O. O. 3) Preparation Of A Technical Design With Calculations (4 Copies In Paper Version, 1 Copy In Electronic Version), 4) Preparation Of Other Studies Necessary For Implementation, Such As, E.G., Traffic Organization Design, Inventory Of Greenery Along With A Design Of Replacement Plantings, Pavement Reconstruction Design, Design Solutions For Collisions Between The Heat Pipeline And Other Area Infrastructure (E.G. Telecommunications, Energy, Water And Gas Networks, Street Traffic Control Cables) Etc.) And Roads, Etc., With Their Agreement With The Reviewing Bodies (E.G. Zdmikp, Police, Relevant Department Of The City Hall) And With The Recipient - The Owner/Controller Of The Area On Which The Connected Facility Is Located - 4 Copies In Paper Version, 1 Copy In Electronic Version, Attached To The Construction Design In The Form Of Attachments, 5) If Necessary, Obtaining A Decision On Cutting Down Trees/Shrubs. The Contractor Will Prepare An Application For Cutting Down Trees/Shrubs Along With All Required Attachments And Submit It To The Ordering Party For The Application To Be Signed By Persons Authorized To Represent Kpec Sp. Z O. O. Further Processing Of The Application, I.E. Possible Additions And Explanations (Through The Ordering Party) Will Be The Responsibility Of The Contractor. 6) Preparation Of A List Of Plots Through Which The Investment Runs, Including Their Owner, Ruler, And The Basis For Disposal - 1 Copy In Paper Version And 1 Copy In Electronic Version, 7) Preparation Of Investment Cost Estimate
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.