Tenders Are Invited For Insurance Brokerage And Agency Services – Insurance Brokers Nordostlink & Multihub

Tender Detail

110375395
176847-2026
Self-Funded
Tenders Are Invited For Insurance Brokerage And Agency Services – Insurance Brokers Nordostlink & Multihub
NCB
Western Europe
European Union,G20
10-04-2026

Work Detail

Insurance Brokerage And Agency Services – Insurance Brokers Nordostlink & Multihub. As Part Of The Network Expansion In The Onshore Area, The Client Intends To Award Insurance Brokerage Services For The Tennet Projects/Sections Of The Nordostlink And Multihubs. Information About The Project: The German Federal Government Has Set Itself Ambitious Goals: Renewable Energies Should Cover Up To 80% Of Germanys Electricity Needs By 2030. Offshore Wind Power Plays A Particularly Important Role - By 2045, The Installed Capacity Of Offshore Wind Farms In The North Sea Is To Be Expanded From The Current Approximately 9 Gigawatts To 70 Gigawatts. In Schleswig-Holstein, More Renewable Energy Is Already Being Generated At Sea And On Land Than Can Be Consumed. The More Wind Turbines Turn On The Coast Every Day, The More Energy Has To Be Transported Via The Power Grid. In The Future, The Nordostlink Will Bring Wind Energy From The West Coast Directly To The Region And Make It Usable Where It Is Generated. The Nordostlink Is A High-Voltage Direct Current Transmission Line That Connects The Heidehub In The Dithmarschen District With The Mühlenbeck Grid Connection Point Near Schwerin Over Approximately 200 Km. Das Vorhaben Besteht Aus Mehreren Gleichstromverbindungen: Die Onshore-Leitungen Dc31 Und Dc32 Sowie Streckenweise Bis Zu Fünf Offshore-Leitungen (Lanwin6, Lanwin7, Nor-X-3, Nor-X-6, Nor-X-9), Die Strom Von Den Windparks Auf See An Land Bringen. All Cables Are Bundled And Laid In A Trunk Route - Depending On The Section, With Two To Six Parallel Dc Connections. In Accordance With Legal Requirements, The Line Is Planned As A 525 Kilovolt Underground Cable. Construction Is Scheduled To Begin In 2028. Commissioning Is Expected To Take Place In 2032. The Two Transmission System Operators Tennet Germany And 50Hertz Are Implementing The Project Together In Five Planning Phases. Tennet Germany Is Responsible For Sections Sh1, Sh2 And Sh3. 50Hertz Is Responsible For Sections Shmv4 And Mv5 (Not In The Scope Of This Tender). So That The Electricity Transported By The Nordostlink Can Be Used Flexibly, Tennet Germany Is Also Building Two Of The First Multi-Terminal Hubs Along The Nordostlink: The Heidehub And The Nordhub. The Multi-Terminal Hub Nordwesthub Is Also In The Scope Of This Tender. Diese Europaweit Einzigartigen Stromdrehkreuze Verknüpfen Die Offshore-Netzanbindungssysteme Auf See Mit Den Großen Gleichstromverbindungen An Land. Gleichzeitig Sorgen Sie Dafür, Dass Der Strom – Durch Umwandlung In Wechselstrom – Direkt Vor Ort Genutzt Und Ins Regionale Verteilnetz Eingespeist Werden Kann. For More Information About Nordostlink: Nordostlink | Tennet Für Mehr Informationen Zu Multihubs: Multiterminal-Hubs Versicherungsmakler-Leistungen: Die Genannten Projekte „Nordostlink“ & „Multihubs“ Erfordern Dabei Vertraglich Festgelegt Eine Abdeckung Aller Risiken In Der Projektphase Über Sogenannte Construction All Risk (Car) Versicherungen. At The Same Time It Must Be Ensured

Key Value

Tender Value
1,36,500 - EUR

Attachment

FileName File Description
Global Tender Document a409ccac-011b-46c7-bf4c-84be6c8b3cd8.html
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail