1. The Subject Of The Order Is The Implementation Of The Investment Entitled: Reconstruction Of Ul. Żeromskiego And Reconstruction And Expansion Of The Section Of Ul. Moniuszki In Nidzica - Stage I. The Investment Includes The Reconstruction Of Ul. Żeromskiego, The Main Goal Of Which Is To Improve The Existing Technical Condition Of The Street. After The Reconstruction Of The Street Żeromskiego Will Be A Municipal Road Of Class L. Reconstruction Of Ul. Żeromskiego Will Involve The Construction Of A New Road Surface Structure, Reconstruction Of Existing Ones And Construction Of New Sidewalks, Exits And Hardened Parking Spaces For Passenger Cars. The Scope Of Works Also Includes The Construction Of A Rainwater Drainage System And Street Lighting, Including A Fragment Of The Stormwater Drainage System In Ul. Moniuszko, Due To The Way Rainwater Is Discharged Into Water Facilities. It Is Planned To Reconstruct The Existing Two-Way Road With A Surface Made Of Granite Stones Within The Urban Layout Of The Old Town In Nidzica On A Section Of 282 M And An Asphalt Concrete Surface With A Length Of 389 M Outside The Urban Layout Of The Old Town In Nidzica. The Rebuilt Road Will Be A Class L Municipal Road With A Variable Road Width From 5.0 M To 8.25 M And Traffic Category Kr3. It Is Planned To Construct Sidewalks On Both Sides Or On One Side, With A Width Of 1.5 M To 2.0 M, With A Surface Made Of Granite Stone Slabs Within The Urban Layout Of The Old Town In Nidzica On A Section Of 282 M And A Surface Made Of Concrete Cubes With A Length Of 389 M Outside The Urban Layout Of The Old Town In Nidzica. It Is Planned To Construct Hardened Roadsides With A Width Of 0.75 M To 1.00 M, Parking Spaces And Exits To The Plots With A Surface Made Of Granite Stones Within The Urban Layout Of The Old Town In Nidzica On A Section Of 282 M And An Asphalt Concrete Surface With A Length Of 389 M Outside The Urban Layout Of The Old Town In Nidzica. Planned Drainage Of The Road Through Storm Sewage, Including A Fragment Of Storm Sewer In The Street. Moniuszko Due To The Method Of Discharging Rainwater To Water Facilities, Along With The Road Structure And Lighting. It Is Planned To Build Pedestrian Roads With A Length Of Approximately 1,094 M. Horizontal And Vertical Markings Will Be Introduced According To The New Traffic Organization. The Road Will Meet The Technical And Operational Parameters Required For A Municipal Road Of Class L. The Commune Has Prepared Design Documentation And For The Execution Of The Subject Of The Contract It Has The Final Decision On The Construction Permit No. 2/2023 Of January 17, 2023 Issued By The Starosta Of Nidzica, The Final Decision On The Permit For The Implementation Of The Road Investment No. 1/2023 Of February 3, 2023 Issued By The Starosta Of Nidzica And The Permit Warmia And Mazury Provincial Conservator Of Monuments To Undertake Activities Related To The Reconstruction Of Żeromskiego Street In Nidzica On November 4, 2022, Reference N
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.