The Subject Of The Order Is The Performance Of Construction Works Including The Implementation Of The Task Titled: Renovation Of The Street Dojazdowa In Tychy, In Accordance With The Material Scope Specified In The Cost Estimate, Simplified Documentation And Technical Specifications For The Execution And Acceptance Of Construction Works (Stwiorb). The Scope Of Works Includes In Particular:1. Preparatory And Organizational Works, Including: • Organization And Development Of The Construction Site, • Development And Implementation Of Temporary Traffic Organization, • Geodetic Marking Of The Works, • Ensuring Industry Supervision, • Introduction And Maintenance Of Temporary Markings, • Inspection Report, Including Ediom.2. Demolition Works, Including: • Demolition Of Existing Surfaces, • Dismantling Of Road Elements And Infrastructure Colliding With The Investment, • Loading, Transport And Disposal Of Demolition Materials In Accordance With Applicable Regulations.3. Earthworks, Including: • Excavations And Trenching For Surface Structures, • Profiling And Compaction Of The Subsoil, • Possible Supplementation Of The Foundation, 4. Pavement Structures, Including: • Execution Of Auxiliary And Basic Bases, • Execution Of Pavement Structural Layers (In Accordance With The Technology Indicated In The Cost Estimate And Stwiorb), • Execution Of Bituminous Layers And Concrete Blocks, • Execution Of Leveling And Wearing Layers.5. Road And Finishing Elements, Including: • Installation Of Curbs, Edges And Stops, • Vertical Adjustment Of Underground Facilities (Manholes, Inlets, Valves), • Reconstruction Works Of Adjacent Areas.6. Technical Infrastructure, Including: • Securing Existing Networks7. Clean-Up And Completion Works, Including: • Tidying Up The Construction Site, • Restoring The Area To The Condition Consistent With The Documentation, • Performing An As-Built Geodetic Inventory, • Providing The As-Built Documentation To The Ordering Party. A Detailed Description Of The Order And The Method Of Its Execution Is Specified In The Bid Cost Estimate And Technical Documentation, Developed For The Purposes Of This Order, Constituting Annexes No. 2 And 3 To The Swz, Respectively.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.