1. The Subject Of The Order Is The Construction Of A Public Toilet Pavilion At The Oborniki Miasto Bus Stop.2. The Subject Of The Order Includes: 1) Development Of Comprehensive Design Documentation Specified In The Functional And Utility Program Along With Obtaining The Necessary Legally Required Opinions, Technical Conditions, Arrangements, Permits And Administrative Decisions, 2) Performance Of All Construction Works Necessary To Implement The Subject Of The Contract On The Basis Of Design Documentation Prepared By The Contractor And Approved By The Ordering Party, 3) Performing Comprehensive Authors Supervision Of The Design Unit Over The Implementation Of The Subject Of The Contract.3) The Subject Of The Order Includes Design Work And Construction Works Aimed At: 1) Demolition Works, Removal And Disposal Of Elements That Conflict Or Are Unnecessary For The Implementation Of The Project, 2) Earthworks, Laying Of Sub-Floor Layers, 3) Excavations And Laying Of Sanitary Sewage, Water And Electricity Supply Lines, 4) Construction Of Foundations For The Construction/Assembly Of The Facility, 5) Construction, Assembly Of A Prefabricated Automatic Public Toilet Pavilion, 6) Connection Of The Toilet For Infrastructure Networks,7) Equipping The Toilet With The Necessary Devices, Equipment And Automation,8) Developing The Processed Area Around The Facility - Hardening The Surface, Arranging Green Areas (Low Greenery, Grass, Trees),9) Starting (Start-Up) The Operation Of The Facility,10) Cleaning Up The Area After The Works.4. Attention!!! The Location Of The Toilet Facility Specified In Variant 2 Of The Functional And Utility Program Is Indicated For Implementation. 5. Construction Works Will Be Carried Out Directly Next To The Existing Service Facility - A Transport Interchange, Including A Multi-Station Bus Stop And A Railway Station. The Area Of Works Should Be Secured Against Access, E.G. With A Fence, And In The Case Of Using Road Lanes, Conditions And Consent Of The Manager Must Be Obtained. If It Is Necessary To Perform Additional Studies (E.G. Permanent Or Temporary Traffic Management Projects), The Contractor Will Perform Them And Obtain Appropriate Consents At His Own Efforts And At His Own Expense. Any Conflicts With The Infrastructure Should Be Resolved Both Formally And Technically And Organizationally Using Your Own Efforts And At Your Own Expense (Including Any Additional Studies Required By The Network Operator). The Works Should Be Organized Carefully, While Maintaining The Safety Rules Of Bus Station Users And Road Users. Additionally, In The Neighboring Area, Construction Works Are Being Carried Out, The Investor Of Which Is Pkp Plk S.A., Related To The Construction Of A Second Railway Track, A Bridge Crossing And The Reconstruction Of The Oborniki Miasto Railway Station (Second Platform).6. The Contractor, In Addition To The Above-Mentioned Work Is Obliged To Make An Information Board Regarding The Received Funding, Dimensions 240
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.