1. The Subject Of The Order Is Construction Of A Village Community Center In Wężowiec, Nowy Dwór Gdański Commune, Nowy Dwór Gdański Commune, On Plot No. 21/38, Kępiny Małe District. The Building Of The Village Community Center Will Be Used As A Meeting Place For The Local Community And Will Provide The Basic Social, Educational And Organizational Needs Of The Residents Of The Wężowiec Commune. The Designed Building Of The Village Community Center Consists Of A Community Room, A Sanitary Facility, A Cloakroom, Kitchen Facilities And A Technical Room. The Building Has One Floor Above Ground, Covered With A Symmetrical Gable Roof With A Roof Slope Angle Of 30 Degrees. The Building Should Be Equipped With, Among Others, The Following Installations: Electrical, Lightning Protection, Photovoltaic Panels, Electricity, Water And Sewage, Central Heating, Domestic Hot Water (Heat Pump), Ventilation, Fire Protection, Rtv, Computer, Cctv, Fire Protection, Monitoring Installation And Connections. Emergency, Evacuation And Fire Safety Signs And Building Equipment Should Also Be Taken Into Account. Characteristic Size Of The Common Room: - Area Usable Area - 108.76 M2 - Area, Buildings - 135.16 M2 - Cubature - 639.98 M3 - Number Of Floors - 1 Above Ground - Building Height To The Highest Point Of The Roof - 5.80 M The Scope Of The Order Includes The Following Construction Works: 1. Construction Works - Building Structure: - Earthworks And Excavations - Foundation Works - Masonry Works For Walls - Wooden Roof Structure With Covering Roof - Windows And Doors - Finishing Works - Plastering, Painting And Development Works - Facade - Land Development, - Building Equipment - Other, Resulting From The Design Documentation. 2. Electrical Works: - Wlz Installation, Plug Sockets, External Lighting - Emergency Lighting Installation - Lightning Protection Installation - Sswin System - External Lighting Installation - Photovoltaic Installation - Telecommunication Installation - Call Installation - Others Resulting From The Design Documentation.3. Sanitary Works - Sewage Installations. Sanitary Installation - Sanitary Fittings - Water Supply Installation - Central Heating Installation - Boiler Room Technology - Heat Pump - Mechanical Ventilation Installation - Air Conditioning Installation - External Installations - Water Supply Connection, Sanitary Sewage Connection - Other, Resulting From The Design Documentation. The Detailed Scope Of Works To Be Performed Is Specified In The Design Documentation, Technical Specification For The Execution And Acceptance Of Construction Works, And Bills Of Quantities As Supporting Documents Constituting Annexes To The Swz. The Contractor Should Treat The Bill Of Quantities Prepared By The Employer As An Information Document That He May Use, But Is Not Obliged To Do So.4. The Scope Of The Order Also Includes: 1) Comprehensive Execution Of Construction Works Based On The Design Documentation Entitled: Construction Of A Village Community Cent
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.