2. The Subject Of The Order Is The Performance Of Construction Works In The Building Of The Volunteer Fire Department In Biała Góra, Located At Biała Góra 21A, 99‑220 Wartkowice, Hereinafter Referred To As The Building, Including The Renovation Of The Main Hall, Technical Room And Separation Of Sanitary Facilities, As Well As The Supply Of Fire-Fighting Equipment And Elements.3. The Order Covers In Particular The Following Scope Of Work And Deliveries:3.1. Renovation Of The Main Hall And The Technical Room Of The Volunteer Fire Department In The Scope Of: 3.1.1. Construction Of A New Insulated Floor Made Of Unglazed Stoneware 60 X 60 Cm. With Plinths, After Dismantling The Existing Wooden Floor - Approx. 90 M2;3.1.2. Installation Of A Suspended Cassette Ceiling - Approx. 90 M2;3.1.3. Execution Of New Plasters Including Finishing And Painting - Approx. 220 M2;3.1.4. Installation Of Internal Window Sills;3.1.5. Installation Of Internal And External Doors And Windows;3.1.6. Construction Of New Electrical Installation And Emergency Lighting.3.2. Separating A Room For Toilets Near The Stage In The Scope Of: 3.2.1. Stage Disassembly Works;3.2.2. Construction Of Partition Walls For Sanitary Rooms;3.2.3. Construction Of A New Insulated Floor Made Of Unglazed Stoneware 60 X 60 Cm. With Plinths – Approx. 10 M2;3.2.4. Execution Of New Plasters Including Finishing And Painting - Approx. 55 M2;3.2.5. Facing Walls With Tiles Measuring E.G. 30 X 30 Cm - Approx. 67 M2;3.2.6. Installation Of Internal Door Joinery;3.2.7. Execution Of Water And Sewage Installations;3.2.8. Construction Of New Electrical Installation And Emergency Lighting;3.2.9. Installation Of Sanitary Fittings;3.2.10. Installation Of Sanitary Equipment.3.3. Purchase And Delivery Of Equipment For The Volunteer Fire Department Building For 50 People, I.E. Chairs And Tables (Up To Item 19 Of The Bill Of Quantities).3.4. Equipping The Volunteer Fire Department Building With Fire Protection Elements. I.E. 2 Fire Extinguishers And 2 Fire Blankets (Items 113 And 114 Of The Bill Of Quantities). 4. The Detailed Material Scope And Method Of Implementing The Subject Of The Order Are Specified In This Specification Of Order Conditions Together With The Contract Constituting Annex No. 4 To The Swz And: 4.1. Construction And Executive Design For The Renovation Of The Main Hall And The Storage And Technical Room (Construction Industry);4.2. Construction And Executive Design For Separating A Room For Toilets In The Volunteer Fire Department Building (Construction Industry); 4.3. Construction And Executive Design For Separating A Room For Sanitary Facilities In The Volunteer Fire Department Building (Sanitary Industry); 4.4. Construction And Executive Design Of The Volunteer Fire Department Building (Electrical Industry);4.5. Technical Description Of The Replacement Of External Windows And Doors Together With A List Of Joinery; 4.6. Detailed Description Of The Building Equipment;4.7. Technical Specification For Th
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.