Construction Work For Buildings Relating To Education And Research – Rohbauarbeiten. Construction Site Equipment, Earthworks, Drainage Canal Work, Drilling Work, Special Foundation Engineering Work, Reinforced Concrete Work, Steel Construction Work, Sealing And Insulation Work; Earthworks: - Base Layers, Subgrade, Excavation And Disposal Special Civil Engineering, Including Explosive Ordnance Detection: - Approx. 285 Bored Piles, Diameter 60 / 90 Cm, Total Length Approx. 2,560 M; Concrete Work, Including: - Pile Head/Tension Beams, 460 M³ - Foundation Slabs, Approx. 450 M² - Floor Slabs, Approx. 3,400 M² - In-Situ Concrete Walls, Approx. 3,200 M² - In-Situ Concrete Ceilings, Approx. 1,250 M² - Prestressed Concrete Hollow Core Ceilings, Approx. 8,750 M² - Prefabricated Supports, Approx. 390 Pieces - Prefabricated Beams, Approx. 2,300 M - Prefabricated Stairs, Approx Bituminous Sealing, Pmbc - Approx. 3,500 M² Perimeter Insulation Horizontally And Vertically Civil Engineering / Drainage Canal Work: - Approx. 600 M Underground Pipes Below The Building Including The Earthworks
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.