Quotation Are Invited For Underground Fire Water Pipeline Leak Rectification Inside Natural Gasstation

Tender Detail

110307615
2412600444
Self-Funded
Quotation Are Invited For Underground Fire Water Pipeline Leak Rectification Inside Natural Gasstation
NCB
Asia
Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
18-03-2026

Work Detail

Quotation are invited for Underground Fire Water Pipeline Leak Rectification inside Natural Gasstation Urgent Requirement: 1032600242 1 ITEM-00001 REMOVAL OF INTERLOCK, EXCAVATION, EXPOSING GRE FIRE WATER PIPELINE, 150MM DIAMETER GRE PIPE LEAK RECTIFICATION, SERVICE PRESSURE TES T POST LEAKRECTIFICATION BY NORMALIZING THE SYSTEM, BACK FILLING, COMPACTION,INTERLOCK TILES REFIXING AND REINSTATEMENT OF AREA INSI DE NATURAL GASSTATION AT H-STATION, PHASE-1, AL-AWEER.SCOPE OF WORK:CONTRACTOR TO CONSIDER FOLLOWING WORK SCOPE,PRELIMINARY PREPARAT ORY WORKS:1.#EXCAVATE A TRIAL PIT OF 80 CM WIDTH TO LOCATE THE LEAK AREA ANDFULLY EXPOSE THE EXISTING GRE PIPELINE, FOLLOWING THE EN GINEER#SINSTRUCTIONS IN THE CENTRALLY MARKED RED ZONE.A.#FIX WORK SCOPE:1.#REMOVAL OF INTERLOCK TILES FOR 3-METER-WIDE X 4 METER LON G = 12SQUARE METER.2.#EXCAVATION FOR 2.2-METER-WIDE X 2-METER-DEEP X 4 METER LONG = 17.6CUBIC METER OF VOLUME AS SHOWN 1 EA IN THE BELOW SKETCH.3.#THE EXCAVATION SHALL BE CONDUCTED IN STEPS AS SHOWN ABOVE.4.#THERE ARE THREE NG PIPELINE FOUNDATIONS LOCATED NEAR TO THEEX CAVATION AREA WHICH ARE HAVING DEPTH OF BOC AT -1.250 METER, HENCEDURING EXCAVATION BELOW THE DEPTH OF 1.25 METER THE SOIL AROUND NG FOUNDATION SHALL BE PROTECTED BY MEANS OF SHORING / STEEL PLATE JACKINGSYSTEM. THE SUPPORTING SYSTEM SHALL BE ROBUST TO PREVENT ANY CHANCE OFSOIL COLLAPSE. THE EXCAVATION SHALL BE DONE IN SAFE MANNER ANDPROTECTING NG FOUNDATIONS.5.#AS THE HEIGHT OF THE EXCAVATION IS AROUND 2 TO 2.2 METERS CONTRACTORSHALL PROVIDE PROPER SLOPE/STEP CUTTING DURING EXCAVATION AND PROTECTIONAGAINST COLLAPSING LOOSE SAND SHALL BE PROVIDED. IN EXISTING PLANT,APPROXIMATE HEIGHT OF 300 MM CONCRETE MIXTURE IS PLACED BELOW INTERLOCKTILES THIS SHALL B E REMOVED AND REINSTATED DURING BACKFILLING.6.#DN150 MM GRE PIPE LEAK RECTIFICATION WITH LAMINATION JOINT SPECIAL NOTES / INSTRUCTIONS: URGENT REQUIREMENT: UNDERGROUND FIRE WATER PIPELINE LEAK RECTIFICATION INSIDE NATURAL GASSTATION; PHASE 1; AL AWEER. for more informa tion and details please contact: zamir.alware [email protected] 04-81-40304 +971509152946 STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2412600444)/$value

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document af0fed76-a2cd-4511-adb8-648dcc06b977.pdf
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail