1. The Subject Of The Order Is The Construction And Expansion Of A Street Lighting Power Line Along Municipal Roads In Manasterz, Nielepkowice, Cetula, Piwoda, Wiązownica, Wiązownica Commune. 2. The Scope Of The Order Includes: 1) Mechanical Earthworks, 2) Construction Of Lighting Circuits Using Yakxs 4X25mm2 Earth Cable, In Accordance With The Plot Development Plan. 3) Installation Of Galvanized Round Steel Poles, 4 M High, Without Arms, On A F 75 Type Foundation, 4) Installation Of Lighting Fixtures - Park Fixtures With Led Canopy In An Aluminum Housing With A Tempered Glass Diffuser, Fixture Power Min. 30W, Tightness Standard Min. Ip66, Mechanical Resistance Class Min. Ik09, Luminaire Luminous Efficiency Min. 150Lm/W, Color Temperature Min. 4000K, Insulation Class Ii. Luminaires Equipped With A Zhaga Socket, Power Supply With A Dali Interface, Luminaires Adapted To Work With A Remote Control System. The Location Of Individual Poles Should Be Made In Accordance With The Land Development Plan.5) When Crossing Paved Entrances To The Property, Roads And Intersections, The Cable Should Be Placed In A Protective Pipe Of The Arot Dvk75 Type,6) Securing The Lighting Fixtures In The Poles By Installing An Izk Fuse Connector With An Insert Fuse Box.7) All Works Performed Should Be Inventoried Before Backfilling The Excavations.3. In Order To Complete The Subject Of The Contract, The Contractor Will Perform The Following Scope Of Works: Marking Out The Lighting Route, Making Trenches For A Cable 0.8 M Deep And 0.4 M Wide, Laying The Cable In The Trench, Laying A Blue Warning Foil, Installing Foundations For Lighting Poles, Installing Lighting Poles, Installing Lighting Fixtures, Pulling Wires Into Poles, Installation And Connection Of Izk Connectors, Laying Tape In The Trench, Examination, Measurements, Marking Of Poles, As-Built Inventory.4. The Subject Of The Order Was Divided Into Separate Parts Of The Order. Detailed Information On The Division Of The Order Is Presented In Chapter V Of Swz.5. A Detailed Description Of The Subject Of The Order And The Scope Of Construction Works Necessary To Perform The Order Is Set Out In The Design And Technical Documentation, Constituting An Annex To The Swz, Which Includes: 1) Technical Design For The Construction Of Street Lighting In Individual Towns In The Commune, 2) Land Development Design, 3) Technical Specifications For The Execution And Acceptance Of Construction Works, 6. All Documents Describing The Subject Of The Order Should Be Treated As Complementary In The Sense That In The Event Of Any Discrepancies, Ambiguities Or Ambiguities, The Contractor Cannot Limit The Scope Of His Obligation Arising From The Contract Regarding The Awarded Public Procurement. In The Event Of Discrepancies Between The Technical Documentation And The Bill Of Quantities, Priority For The Valuation Of The Works Is Given To The Design Documentation And The Stwiorb. The Bill Of Quantities Should Be Treated