Installation Of Liquid Fuel And Oil-Fired Steel Heat Pipe Steam Water Heating Steel Boilers, Thermal Efficiency: Up To 0.21 (0.18) Mw (Gcal/H), Gas-Fired Cooling Boiler Productivity 60, 000 Kcal/Hour, Maximal Consumption 66Kw, Gas Consumption 4.52-6.90M3/Hour, Working Temperature 55-85C°, Chimney Length = 180Mm, Dimensions 1020/830/780Mm, Installation Of Steam Water Distribution Racks From Steel Pipes, Outer Diameter Of The Body: 108 Mm, Collector Ø 108X4 L=1.0 M, Gas Regulator (Reducer), Diameter 50 Mm, Frs Brand, , Installation Of Gas Pressure Regulators, Diameter: Up To 50 Mm, Installation Of Centrifugal Pumps With Electric Motor, Mass Of Unit: Up To 0.1 Ton (Repair), Placement Of Manometers: With Three-Way Tap, Manometer (Water Pressure Gauge) (0-25Bar), Installation Of Rectangular And Circular Expansion Tanks, Capacity: Up To 0.1 M3 (Repair), Installation Of Capacity Coolers, Capacity: Up To 1 M3 (Boiler Repair), Insulation Of Pipe Belts With Foamed Rubber, Foamed Polyethylene Products: With Pipes Up To 160 Mm (10 M), Replacement Of Glass Packages Of Plastic Windows (100 M2), Installation Of Metal Door Blocks In Ready Spaces, Constructions Of Aluminum Alloy Blinds And Nailing Details
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.