Quotation are invited for HRSG71 Stage 1 DB Repair Work and FCD Plate Machining, Erection and Repair Work. TECHNICAL AND GENERAL SPECIFICATIONS -OUTSOURCING WORK. L STATION PHASE I, JEBEL ALINAME OF WORK:#HRSG 71 STAGE 1 DB REPAIR WORK AND FCD PLATE MACHINING,ERECTION AND REPAIR WORK.#PERIOD OF WORK:#5 CALENDAR DAYS DURING SHUTDOWN OF HRSG71 TENTATIVEFROM 27.03.2026GEN ERAL TERMS & CONDITIONS APPLICABLE FOR THE ENTIRE PROJECT :#·#THE CONTRACTOR SHALL VISIT THE SITE AND MAKE HIMSELF FULLY FAMILIARWIT H THE WORK SCOPE, PLANT ACCESS, FACILITIES, COMPLEXITIES, SAFETYMEASURES, ERECTION PROCEDURES ETC., BEFORE HE SUBMITS HIS BID.·#PART Y SHALL CONSIDER ONE MOBILIZATION TO COMPLETE THIS JOB DURINGONGOING HRSG-UNIT SHUTDOWN (DURING FEBRUARY TO MARCH 2026).·#PREPARATOR Y WORK, IF ANY, SHALL BE CARRIED OUT BY THE PARTY BEFORESTART OF WORK UPON INFORMATION FROM DEWA.·#SUBMIT DETAILED WORK PLAN, WPS, R ISK ASSESSMENT, CRANE REQUIREMENT,CRANE CAPACITY, LIFTING PLAN, AND METHOD STATEMENT OF THE WORK INADVANCE TO DEWA. (THE CRANE REQUI REMENT SHALL BE PROVIDED IN ADVANCE ASDEWA HAS TO OUTSOURCE THE CRANE IF REQUIRED).·#CHECK AND ENSURE THAT SITE CONDITIONS ARE SUITA BLE FOR CARRYING OUTWORK. CONDUCT SITE SURVEY AND SAFETY INSPECTION TO ASSESS THE WORKINGENVIRONMENT.·#PARTY SHOULD MOBILIZE THE LAB OR, EQUIPMENT, TOOLS, ETC. IMMEDIATELYAFTER DEWA NOTIFICATION. THE PARTY SHALL BE READY TO START THE WORK WITHONE-DAY ADVANCE NOTIFI CATION.·#CONTRACTOR SHALL WORK ROUND THE CLOCK (24 HOURS) TO COMPLETE THE WORKWITHIN THE SCHEDULE.·#A SAFETY MEETING WILL BE HELD TO EVALUATE THE RISK INVOLVED INMETHODS TO BE USED. RISK ASSESSMENT AND TOOLBOX TALK TO BE GIVEN TO THEEMPLOYEES.·#ALL LIFTING AND POW ER TOOLS SHALL BE TESTED AND THE TEST CERTIFICATETO BE PROVIDED TO DEWA.·#PARTY SHALL VERIFY THAT SCAFFOLDS ARE SAFE TO WORK AND VAL IDSCAFFOLDING TAGS ARE PROVIDED BEFORE USING ANY SCAFFOLDING.·#THE SCOPE OF WORK CAN BE USED IN ANY HRSG#S DB& FCD REPAIR ANDINVOICE WILL BE CLEARED BASED ON THE ACTUAL WORK DONE.·#REMOVAL OF ALL SCRAPS FROM WORKPLACE AND DISPOSAL AS PER DEWAENGINEER INSTRUCTION·# JOB COMPLETION ACCEPTANCE IS SUBJECTED TO DEWA PERSONNEL INSPECTIONAND VERIFICATION.·#HOUSEKEEP THE AREA ON REGULAR BASIS AS OTHER C ONTRACTORS MUST WORK INTHE SAME AREA.·#DE-MOBILIZATION AND SITE CLEARANCE UPON COMPLETION OF ENTIRE PROJECTSCOPE.·#PREVIOUS SIMILAR EXPERIENCE PO # TO BE PROVIDED FROM DEWA OR ANYOTHER WELL-KNOWN COMPANY.·#WORK COMPLETION REPORT INCLUDING WPS, ITP, RIGGING TOOL CE RTIFICATES,RISK ASSESSMENT, MEASUREMENT REPORT AND PHOTOS SHALL SUBMIT FOR EACHSCOPE OF ACTIVITIES.SCOPE OF WORK 1: FCD PLATE MACHIN ING/FABRICATION (DG02 P122) (SS 321HPLATE, 15MM THICK)·#UPON RECEIVING THE PO, CONTRACTOR SHALL COLLECT THE PLATE FROM DEWA,L1 STATI ON FOR MACHINING.·#MACHINE THE PLATE AS PER AS PER THE SITE REQUIREMENT (PLATE SIZE,POROSITY AND PROFILE SHALL MATCH WITH EXISTING P LATE, THE DRAWINGPROVIDED FOR ESTIMATION ONLY)·#DELIVERY OF THE PLATE BACK TO DEWA, L1 STATION.·#SUBMIT MEASUREMENT VERIFICATION REP ORT WITH DRAWING OF THE FABRICATEDPLATE.·#RETURN THE REMAINING PLATE AND WASTE MATERIAL DERIVED FROM THEMACHINING TO DEWA. Qty: 1 HRSG71 Stage 1 DB Repair Work and FCD Plate Machining, Erection and Repair Work. - Scope of work attached, Contact Person: Nadeem Anjum/
[email protected] / 04-81-40587 STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332600630)/$value