Quotation are invited for Insulation Removal and Refixing in Steam and Water System, L-1 Station. INSULATION REMOVAL AND REFIXING IN STEAM & WATER SYSTEM. L-1 STATION,MMD-MBR. WO 511306878PERIOD OF WORK04 DAYS DURING EACH SHUTDOWN OF L1 STATION FROM MARCH 2026 TO APRIL2027.QUANTITY400M² (INSULATION THICKNESS FROM 150MM TO 350MM)SCOPE OF WORK·#THE CONTRACTOR SH ALL VISIT THE SITE AND MAKE HIMSELF FULLY FAMILIARWITH THE WORK SCOPE, PLANT ACCESS, FACILITIES, COMPLEXITIES, SAFETYMEASURES ETC., BEFORE HE SUBMITS HIS BID.·#CONTRACTOR SHALL CONSIDER MINIMUM THREE MOBILIZATIONS TO COMPLETE THESCOPE.·#DEWA WILL NOT ACCEPT THE BI D WITHOUT VISITING THE SITE, AS THIS WORKTO BE CARRIED OUT DURING TOTAL SHUT DOWN OF L1 STATION AND DELAY MAYAFFECT THE PLANT AVAILA BILITY.·#TO GET A PTW, THE CONTRACTOR MUST SUBMIT RISK ASSESSMENT AND METHODOF STATEMENT PRIOR TO STARTING THE WORK.·#CHECK CONDITIO NS ARE SUITABLE FOR CARRYING OUT WORK. CONDUCT SITESURVEY AND SAFETY INSPECTION TO ASSESS THE WORKING ENVIRONMENT.·#A SAFETY MEETING WILL BE HELD TO EVALUATE THE RISK INVOLVED INMETHODS TO BE USED, RISK ASSESSMENT AND, TOOLBOX TALK TO BE GIVEN TO THEEMPLOYEES.·#MO BILIZE THE LABOR, EQUIPMENT, TOOLS, ETC. IN 24 HRS. NOTICE PERIOD.·#THE CONTRACTOR SHALL WORK ON 24 HRS. BASIS TO COMPLETE THE JOB O NTIME, BASED ON DEWA REQUIREMENT.·#COVER THE COMPLETE GRATING UNDER THE HEADER TO AVOID THE INSULATIONFALLING ON GROUND FLOOR/ ON OT HER EQUIPMENT.·#INSULATION REMOVAL WILL BE REQUIRED DURING INTEGRITY INSPECTION OFHRSG71, AUXILIARY BOILER 76 & 77 SHUTDOWNS AND FOR ANY OTHER UNITOUTAGES OR EMERGENCY JOBS.·#MARK/NAME CLADDING SHEETS AND REMOVE THE CLADDING SHEET, INSULATIONCLAMPS AND INSULATION AS PER DEWA REQUIREMENT.·#FOR INTEGRITY INSPECTION, ONLY POCKETS MAY REQUIRE REMOVAL FROM THEENTIRE PIPELINE AND ONLY THE POCKET ARE A SHALL BE CALCULATED FOR THEMEASUREMENT IRRESPECTIVE OF THE INSULATION THICKNESS.·#KEEP THE REMOVED INSULATION AND CLADDING SHEETS IN SAFE LOCATIONS ANDDO NOT ALLOW THE INSULATION FIBERS TO FLY IN THE AIR.·#CLEAN THE SURFACE OF THE PIPE AFTER REMOVAL OF THE INSUL ATION.·#ANY CLADDING SHEET BOX (VALVES OR EQUIPMENT) REMOVAL REQUIRED TOACCESS THE REQUIRED AREA SHALL BE DONE BY THE CONTRACTOR. CL ADDING SHEETALONE REMOVED CANNOT BE CONSIDERED IN TOTAL INSULATION REMOVALMEASUREMENT.·#INFORM DEWA PERSONNEL IN CASE OF ANY ABNORMA LITIES / DAMAGES FOUND INTHE CLADDING SHEETS/ INSULATION SUPPORT CLAMPS ETC.·#INSULATION SUPPORT CLAMPS TO BE REMOVED WHEREVER REQUI RED TO ASSISTTHE INSPECTION.·#INSULATION SUPPORT CLAMPS TO BE REPAIRED BASED ON THE REQUIREMENT.·#AFTER COMPLETION OF THE REPAIR WOR K, DEWA ENGINEER WILL GIVE CLEARANCE FOR INSULATION REFIXING.·#INSTALL THE INSULATION SUPPORT CLAMPS AT SAME DISTANCE FROM WHERETHES E CLAMPS WERE REMOVED.·#INSTALL THE INSULATION (NEW INSULATION TO BE USED IF OLD INSULATIONFOUND DAMAGE).·#ENSURE THAT THERE ARE NO WASTE / CLOTH / COMBUSTIBLE MATERIALS INSIDETHE INSULATION / OVER THE PIPE SURFACE WHICH MAY CATCH FIRE DURING HOTOPERATING CONDITIO NS.·#MAINTAIN THE SAME THICKNESS OF INSULATION AS IT WAS EXISTING PRIOR TOREMOVE THE INSULATION. Qty: 400 Insulation Removal and Refixing in Steam and Water System, L-1 Station. Contact Person - Basil Joy,
[email protected], 043224105 . SOW enclosed STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332600629)/$value