Tenders Are Invited For Heating Plant Construction Work – Construction Of A Heat Pump System And An Electric Boiler With Accompanying Infrastructure At The Czeczott Heating Plant In Wola.
Tenders Are Invited For Heating Plant Construction Work – Construction Of A Heat Pump System And An Electric Boiler With Accompanying Infrastructure At The Czeczott Heating Plant In Wola.
Heating Plant Construction Work – Construction Of A Heat Pump System And An Electric Boiler With Accompanying Infrastructure At The Czeczott Heating Plant In Wola.. The Subject Of The Investment Order Is The Implementation Of The Task Entitled: Construction Of A Heat Pump System And An Electric Boiler With Accompanying Infrastructure At The Czeczott Heating Plant In Wola, Under Which A New Energy Facility Will Be Built In The Boiler Room Of The Czeczott Heating Plant In Wola, Consisting Of A Heat Pump System And An Electric Boiler As Well As Auxiliary Installations And Equipment. The Subject Of The Order Includes, Among Others: Execution Of Construction And Executive Designs, Deliveries, Construction And Assembly, Commissioning And Commissioning Of The Facility, Including: Training Of The Ordering Partys Staff, Warranty Service Of The Facility. The Subject Of The Order Includes In Particular: • Installation Of A High-Temperature Electric Boiler With A Capacity Of Not Less Than 2 Mw, • Installation Of An Air/Water Heat Pump System With A Total Capacity Of Not Less Than 5 Mw, • Delivery And Installation Of Auxiliary Equipment And Accompanying Infrastructure, • Assembly And Construction Works, Including: Disassembly, Construction, Electrical, Sanitary And Instrumentation Works, • Adaptation Of Facilities And Installations To Fire Protection Requirements, • Integration Of The System With Newly Built Gas Sources (Gas Cogeneration Unit 2.096 Mwe / 2.042 Mwt And Gas Boiler 2.5 Mw) And The Wr-25/3 Boiler (12.0 Mw) Left For Cold Storage Purposes Reserve/Peak Boiler. The Main Devices Implemented As Part Of The Bup Investment, I.E. Construction Of A Heat Pump System And An Electric Boiler That Will Work With The Wr-125/3 12.0 Mw Boiler Currently Operating In The Czeczott Mine, And New Gas Sources Were Launched: Gas Cogeneration With An Electric Power Of 2.096 Mwe And A Thermal Power Of 2.042 Mwt Along With A Gas Boiler With A Power Of 2.5 Mwt. After The Construction And Commissioning Of Bup, The Wr-5 Boiler Is Planned To Be Decommissioned And The Wr-12 Boiler Is To Be Moved To A Cold Reserve/Peak Source.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.