1. The Subject Of The Order Are Stove Works Consisting In The Relocation, Reconstruction Or Construction From Scratch Of Tiled Stoves In Residential Premises Administered By The Residential Buildings Administration In Zielona Góra - Divided Into The Basic Scope And Optional Scope Of The Order.2. The Basic Scope Of Works Covered By The Specification Includes: No. Scope Of Works Estimated Quantity 1 Installation Of A Type B2 Stove With A Volume Of Up To 1 M³ 5 Pcs. 2 Installation Of A Type C1 Stove With A Volume Of Over 1 M³ 5 Pcs. 3 Installation Of A Kitchen Core With A Heater Type Ko-1 2 Pcs. 4 Reconstruction Of A Tiled Stove With A Volume Of Up To 1 M³ 6 M³ 5 Reconstruction Of A Tiled Stove With A Capacity Of Over 1 M³ 6 M³ 6 Reconstruction Of The Kitchen Core With A Type Ko-1 Heater 2 M³ 7 Demolition Of The Stove And Kitchen Core 12 M³ 8 Construction Of The Foundation 4 Sets. 9 Removal Of Rubble 30 M³ 3. Information About Options: The Ordering Party Envisages Awarding The Contract Under The Option Right Referred To In Art. 441 Section 1 Of The Public Procurement Law. Detailed Requirements Regarding The Method Of Awarding The Contract Under The Option Right Are Specified In The Contract Template And In The Description Of The Subject Of The Order (Technical Specification For The Execution And Acceptance Of Construction Works), Constituting Annexes No. 6 And 7 To The Swz, Respectively. The Scope Of Works Covered By The Specification Under The Option Right Includes: No. Scope Of Works Estimated Quantity 1 Installation Of A Type B2 Furnace With A Capacity Of Up To 1 M³ 5 Pcs. 2 Installation Of A Type C1 Furnace With A Volume Of Over 1M³ 5 Pcs. 3. Installation Of A Kitchen Core With A Heater Type Ko-1 2 Pcs. 4. Reconstruction Of A Tiled Stove With A Volume Of Up To 1.0 M³ 6.0 M³ 5. Reconstruction Of A Tiled Stove With A Volume Of Over 1.00 M³ 6.0 M³ 6. Reconstruction Of A Kitchen Core With A Heater Type Ko-1 2.0 M³ 7. Demolition Of The Stove And The Core. Kitchen 12 M³ 8 Foundation Construction 4 Sets 9 Removal Of Rubble 30 M³ 4. Common Procurement Vocabulary Cpv: 45262630-6 - Construction Of Kilns5. The Ordering Party Requires The Contractor To Have A Current Third Party Liability Insurance Policy For Its Business, In Accordance With §6 Of The Contract Template.6. The Contractor Provides The Ordering Party With A Minimum 60-Month Warranty For Newly Manufactured Stoves And Kitchen Handles, As Well As A Warranty Covering The Warranty Period. Note: The Extension Of The Warranty Period Is Subject To Scoring In Accordance With The Offer Evaluation Criteria Specified In Point 20.2.2) Of The Swz. For The Remaining Works, The Contractor Provides A 36-Month Warranty And A Warranty Covering The Warranty Period.7. The Ordering Party Does Not Reserve The Right To Apply For The Contract Only By Contractors Referred To In Art. 94 Of The Public Procurement Law. 8. Pursuant To Art. 95 Of The Public Procurement Law, The Ordering Party Requires The Contractor Or Subc
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.