Air Pollution Protection Services – Supply, Installation And Operation Of A Biogas Filtration Device On The Valoparc Site (16). This Consultation Concerns: - The Operation Of A Filtration Device Allowing The Reduction Of H2s Upstream Of The Biogas Flaring Device; - The Treatment Of All By-Products Generated By The Process Implemented. The Entire Filtration System Will Be Installed On The Valoparc Isdnd In Sainte-Sévère (16). The Requested Pre-Treatment Service Must Include: - The Supply Of The Appropriate Treatment Device (Washing Unit, Filter Media, Etc.) And Its Packaging (Fixed Or Mobile Tanks, Skips, Etc.), - The Connection Device To The Existing Piping (Lig Lag Or Direct Connection Depending On The Packaging Or The Treatment Process Chosen), - The Removal, Transport And Treatment Of Consumables After Use In An Approved Treatment Sector, - The Possible Training, If Necessary, Of Calitom Agents For Monitoring The Installation. The Contract Will Have A Fixed Duration Of Two Years From The Date Of Notification. The Date Of May 13 Indicated Is A Forecast Date, In No Case Is It Contractual
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.