Scientific Installations – 4730 Fachraumausstattung. New Construction Of A Secondary School With A Cafeteria, A Double Sports Hall, A Break Hall As A Meeting Place And Outdoor Sports Facilities On The Opposite Side Of Hohenbrunner Straße. Parts Of The Building Are Planned As A Timber Hybrid Construction. The Execution Takes Place In One Construction Phase. Address Construction Site: Hohenbrunner Straße 110 85662 Hohenbrunn Bri Approx. 64,500 M3 Gfa Approx. 14,000 M2 Building 1-3 Floors Plus 1 Basement The Main Services Included In The Lv Are Listed Below: - Construction Site Equipment - Approx. 224 Tables 60X60cm - Approx. 7 Tables 120X60cm - Approx. 224 Pieces Of Student Chairs - Approx. 15 Pieces Of Teachers Chairs - Approx. 8 Pieces Of Sink Row With 3 Basins - Approx. 7 Pieces Of Ceiling Systems With 8 Removal Points - Approx Storage Cabinets - Approx. 21 Pieces Top Cabinets For Storage Cabinets - Approx. 3 Pieces Collection Blocks - Approx. 5 Pieces Cabinets With Suction - Approx. 3 Pieces Steel Cabinets With Suction - Approx. 2 Pieces Wall-Standing Media Cell - Approx. 2 Pieces Free-Standing Media Cell - Approx
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.