Construction Work For Water Projects – Briegden-Neerharen Canal. Renovation Of The Locks Of Lanaken And Neerharen.. The Object Of This Assignment Is To Renovate The Structural And Electromechanical Equipment (Emu) Of The Lanaken Lock (Sl) And The Neerharen Lock (Sn). The Assignment Is Divided Into The Following Fixed And Conditional Parts: Dc1 - Fixed Part: This Phase Includes The Preparation Of The Planning And The Implementation Of The Study. Dc2- Vw Part: Ordering And Working In The Workshop. Dc3- Vw Part: Work On The Lock In Lanaken + As-Built Vo. Dc4- Vw Gedeelte: Werken Aan De Sluis In Neerharen + As-Built Vo. Dc5- Vw Part: 3 Wagon Slides. The Execution Period For The Works Is 150 Working Days For The Permanent Part. The Execution Period For The Works Is 180 Working Days For Vwd1-Dc2. De Uitvoeringstermijn Van De Werken Bedraagt 80 Werkdagen Voor Vwd2-Dc3, Fase 2.1. The Implementation Period Of Vwd2-Dc3 Phase 2.2 Is 40 Working Days. The Execution Period For The Works Is 60 Working Days For Vwd3-Dc4, Phase 3.1. The Implementation Period Of Vwd3-Dc4 Phase 3.2 Is 40 Working Days. The Execution Period Of The Works Is 200 Working Days For Vwd4-Dc5 (Incl. The Delivery Of Td In Status As-Built Vo (Abvo). For An Overview Of The Appendices, We Refer To The Document: Aro-24-2101 Appendices Overview.Pdf
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.