Quotation are invited for HRSG 71 Diverter Damper Blade Frame Partial Replacement at L1 Station. NAME OF WORK:#HRSG71 DIVERTER DAMPER BLADE FRAME PARTIAL REPLACEMENT (DRAWING ATTACHED BELOW)PERIOD OF WORK:#8 CALENDAR DAYS - DURIN G SD FROM MARCH 2026 TO APRIL2026 (TENTATIVE)SCOPE OF WORK:#HRSG71 DIVERTER DAMPER BLADE FRAME PARTIAL REPLACEMENT·#THE CONTRACTOR S HALL VISIT THE SITE AND MAKE HIMSELF FULLY FAMILIARWITH THE WORK SCOPE, PLANT ACCESS, FACILITIES, COMPLEXITIES, SAFETYMEASURES, EREC TION PROCEDURES, NUMBER OF WELDS ETC., BEFORE HE SUBMITSHIS BID.·#THE PARTY SHALL SUBMIT ITP, WPS, MOS AND ERECTION PLAN AFTER GETTI NGPO AND BEFORE COMMENCING ANY WORK.·#TO GET A PTW, HWP AND CSE, CONTRACTOR SHALL SUBMIT RISK ASSESSMENTFORMS AND METHOD STATEMENT P RIOR TO STARTING THE WORK.·#CHECK CONDITIONS ARE SUITABLE TO CARRY OUT WORK. CONDUCT SITE SURVEYAND SAFETY INSPECTION TO ASSESS THE WORKING ENVIRONMENT.·#A SAFETY MEETING WILL BE HELD TO EVALUATE THE RISK INVOLVED INMETHODS TO BE USED. RISK ASSESSMENT AND TOOL BOX TALK TO BE GIVEN TO THEEMPLOYEES.·#PARTY SHALL MOBILIZE THE LABOR, EQUIPMENT, TOOLS, ETC. IMMEDIATELYAFTER DEWA NOTIFICATION. PARTY SHALL BE READY TO START THE WORK WITH TWODAYS ADVANCE NOTIFICATION.·#THE PARTY SHALL WORK ON A SHIFT BASIS AND ROUND THE CLOCK (24 HRS.)TO COMPLETE THE PROJECT WITHIN THE STIPULATED TIME.·#ALL LIFTING AND POWER TOOLS SHALL BE TESTED AND TEST CERTIFICATES TOBE PRO VIDED TO DEWA.·#PARTY SHALL VERIFY THAT SCAFFOLDS ARE SAFE TO WORK AND VALIDSCAFFOLDING TAGS ARE PROVIDED BEFORE USING ANY SCAFFOLDI NG.·#PARTY SHALL ENSURE THAT DD HPU SYSTEM IS DEPRESSURIZED BEFORESTARTING ANY ACTIVITIES.·#INSPECT THE DIVERTER DAMPER BLADE FRAME AND IDENTIFY THE DEFECTS ANDREPLACEMENT REQUIRED FRAME PORTION ALONG WITH DEWA.·#REMOVE LINER PLATES AND INSULATION FROM HRSG & GT S IDES OF THE BLADESKIN.·#THOROUGH INSPECTION OF THE SKIN PLATES FOR ANY DAMAGE.·#UPON IDENTIFICATION OF THE BLADE FRAME (CHANNELS/BEA MS) DAMAGE,WINDOWS SHOULD CUT (RIGHT, LEFT, TOP, BOTTOM, HRSG & GT SIDE ASREQUIRED) TO GET ACCESS TO THE DAMAGED FRAME COMPONENTS.·# CONDUCT ALIGNMENT CHECK OF THE BLADE INCLUDING DIAGONAL AND FOURCORNER MEASUREMENTS.·#IF REQUIRED, CONTRACTOR SHALL ARRANGE TO MECHA NICALLY LIFT AND HOLDTHE DAMPER IN DESIRED POSITION TO GET ACCESS TO THE DAMAGED COMPONENT. Qty: 1 HRSG 71 Diverter Damper Blade Frame Partial Replacement at L1 Station Note Scope of work attached, Please contact Mr. Nadeem 04 81 40587
[email protected] for any further information. STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332600609)/$value