Technical Specification No Item / Service Technical Requirements Of The Contracting Authority Delivery And Installation Of A Heating Water Boiler For Diesel Fuel (Oil), Including, If Necessary, Making An Opening In The Outer Wall Of The Building For Bringing In The Water Boiler. 1 Pc. Minimum 400 Kw Delivery And Installation Of A Heating Water Boiler For Diesel Fuel (Oil), Including, If Necessary, Making An Opening In The Outer Wall Of The Building To Bring In The Water Boiler. 1 Pc. Minimum 500 Kw Delivery And Installation Of A Burner For Diesel Fuel (Petroleum) 1 Pc. 250 Kw To 550 Kw Or Equivalent With Identical Modulating Operating Power Range Supported Delivery And Installation Of A Burner For Diesel Fuel (Petroleum) 1 Pc. 250 Kw To 550 Kw Or Equivalent With An Identical Range Of Modulating Operating Power Supported Delivery And Installation Of Circulation Pump 1 Pc. 18 M3/H, 10M, 1000W Delivery And Installation Of Circulation Pump 1 Pc. 6.6 M3/H, 8.9M, 440W Delivery And Installation Of Distribution Manifold 1 Pc. ∅159, L=1500Mm Delivery And Installation Of A Collector 1 Pc. ∅159, L=1500Mm Delivery And Installation Of A Chimney Body With Thermal Insulation 5.5 M., Metal, ∅ 300 Delivery And Installation Of A Chimney Body With Thermal Insulation 6 M., Metal, ∅ 250 Delivery And Installation Of An Elbow Chimney Body With Thermal Insulation 3 Pcs. ∅300 Delivery And Installation Of An Elbow Chimney Body With Thermal Insulation 4 Pcs. ∅250 Delivery And Installation Of A Shutter 7 Pcs. Dn80, Pn 10 Delivery And Installation Of Shutter 3 Pcs. Dn50, Pn 10 Delivery And Installation Of A Crane 2 Pcs. Spherical 3/4 Delivery And Installation Of A Non-Return Valve 1 Pc. Dn80, Pn 10 Delivery And Installation Of A Non-Return Valve 1 Pc. Dn50, Pn 10 Delivery And Installation Of A Filter 1 Pc. Dn80, Pn 10 Delivery And Installation Of A Filter 1 Pc. Dn50, Pn 10 Delivery And Installation Of A Thermomanometer 2 Pcs. F100, 120 C, 10Bar Delivery And Installation Of Pipe 22 M. St ∅88.9/4 Delivery And Installation Of Pipe 4 M. St ∅60.3/3.6 Delivery And Installation Of Pipe 0.5 M. St ∅26.9/3.2 Delivery And Installation Of Elbow 15 Pcs. St ∅88.9/4, 90 Degrees Delivery And Installation Of Elbow 7 Pcs. St ∅60.3/3.6, 90 Degrees Delivery And Installation Of Pipe Insulation 25 M. For Pipe ∅88.9 Delivery And Installation Of Pipe Insulation 7 M. For Pipe ∅60.3 Delivery And Installation Of A Reinforcing Structure 100 Kg. Metal Delivery And Installation Of An Expansion Vessel 1 Pc. 600 Liters And Safety Valve Dismantling Cast Iron Radiators 6 Pcs. Dismantling Existing Boilers 2 Pcs. Delivery And Installation Of Panel Radiators 6 Pcs. 600/2000 Mm. Delivery And Installation Of Shut-Off Valves And Fittings For Panel Radiators 6 Pcs. Wiring And Connection Of Boilers And Pumps And Control. 2 Pcs. Start-Up And Settings Of Boilers And Burners 2 Pcs. Hydraulic Samples 2 Pcs. Note: The Participants Should Bear In Mind That The Contracting Authority Found A Technical Error In The Project, Expressed In The Following: In The Attached Project, Part - Specification Of Materials In Item 1, Instead Of 400 Kw, 500 Kw Is Written. The Contracting Authority Instructs The Applicants That They Should Bid For A Value Of 400 Kw On Line 1 Of The Specification Of Materials For A Diesel Fuel (Petroleum) Hot Water Boiler.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.